Evidence relationships · GBR · neso_tec

Aberarder Extension Wind Farm

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:97907e94081b1321244a0661 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:0d8cecdcf2cfa0887bc2f1af
to_kindpower_object
to_idneso:connection_site:97907e94081b1321244a0661
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:7

Sources EV-aaf99c445884a5a87a22768a
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 a813bb802309e1babc47467ea8195461e897ea7a436d2c51cbc929b9f3222b47

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Aberarder Extension Wind Farm

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-aaf99c445884a5a87a22768a
MW Increase / Decrease138 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-aaf99c445884a5a87a22768a
Cumulative Total Capacity (MW)138 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-aaf99c445884a5a87a22768a
Detailed source fields
Original source fieldPublished value or condition
Project NameAberarder Extension Wind Farm
Customer NameRenewable Energy Systems Limited
Connection SiteAberarder Extension Wind Farm 132/33kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease138.00
Cumulative Total Capacity (MW)138.00
MW Effective From2031-04-30
Project StatusScoping
Agreement TypeDirect Connection
HOST TOSHET
Plant TypeEnergy Storage System;Wind Onshore
Project IDa0l8e0000010wQ0AAI
Project NumberPRO-002589
Gate1
Original textScoping
source_record_idcsv:row:7

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:7

Sources EV-aaf99c445884a5a87a22768a
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 a813bb802309e1babc47467ea8195461e897ea7a436d2c51cbc929b9f3222b47

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Aberarder Extension Wind Farm

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameAberarder Extension Wind Farm
Customer NameRenewable Energy Systems Limited
Connection SiteAberarder Extension Wind Farm 132/33kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease138.00
Cumulative Total Capacity (MW)138.00
MW Effective From2031-04-30
Project StatusScoping
Agreement TypeDirect Connection
HOST TOSHET
Plant TypeEnergy Storage System;Wind Onshore
Project IDa0l8e0000010wQ0AAI
Project NumberPRO-002589
Gate1
Original textScoping
source_record_idcsv:row:7

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:7

Sources EV-aaf99c445884a5a87a22768a
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 a813bb802309e1babc47467ea8195461e897ea7a436d2c51cbc929b9f3222b47

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel