POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Elmya Braybrooke BESS

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:98c9ee5c8abefe45fa448a5e · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:0cfd0c569569a3c7b3873e78
to_kindpower_object
to_idneso:connection_site:98c9ee5c8abefe45fa448a5e
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:693

Sources EV-84f2376901e275543e48851f
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 60d07d0b21877efe9fcba0fdd03fd85bf39d98246f4113faaad94c76b043300c

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Elmya Braybrooke BESS

Connection register · awaiting consents

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-84f2376901e275543e48851f
MW Increase / Decrease252 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-84f2376901e275543e48851f
Cumulative Total Capacity (MW)252 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-84f2376901e275543e48851f
Detailed source fields
Original source fieldPublished value or condition
Project NameElmya Braybrooke BESS
Customer NameELMYA RPC UK BRAYBROOKE LIMITED
Connection SiteBraybrooke 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease252.00
Cumulative Total Capacity (MW)252.00
MW Effective From2031-10-31
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System
Project IDa0l4L0000005ikbQAA
Project NumberPRO-002427
Gate1
Original textAwaiting Consents
source_record_idcsv:row:693

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:693

Sources EV-84f2376901e275543e48851f
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 60d07d0b21877efe9fcba0fdd03fd85bf39d98246f4113faaad94c76b043300c

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Elmya Braybrooke BESS

project stage · awaiting consents

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameElmya Braybrooke BESS
Customer NameELMYA RPC UK BRAYBROOKE LIMITED
Connection SiteBraybrooke 400kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease252.00
Cumulative Total Capacity (MW)252.00
MW Effective From2031-10-31
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TONGET
Plant TypeEnergy Storage System
Project IDa0l4L0000005ikbQAA
Project NumberPRO-002427
Gate1
Original textAwaiting Consents
source_record_idcsv:row:693

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:693

Sources EV-84f2376901e275543e48851f
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 60d07d0b21877efe9fcba0fdd03fd85bf39d98246f4113faaad94c76b043300c

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel