POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Kedrum Solar Farm

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:c449ea3732b4bf775e7974f8 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:0836f5dc25a2dd579048f898
to_kindpower_object
to_idneso:connection_site:c449ea3732b4bf775e7974f8
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1109

Sources EV-2fbe1af530b961013ca23336
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 fbbe50ac84dd7ade6de83c3369ff16c08b0590163981f18f2f529aa05bd12662

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Kedrum Solar Farm

Connection register · awaiting consents

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-2fbe1af530b961013ca23336
MW Increase / Decrease150 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-2fbe1af530b961013ca23336
Cumulative Total Capacity (MW)150 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-2fbe1af530b961013ca23336
Detailed source fields
Original source fieldPublished value or condition
Project NameKedrum Solar Farm
Customer NameRosside Energy Limited
Connection SiteBlackhillock 275kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease150.00
Cumulative Total Capacity (MW)150.00
MW Effective From2030-05-30
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TOSHET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e000000TPc0AAG
Project NumberPRO-003444
GateNot obtained
Original textAwaiting Consents
source_record_idcsv:row:1109

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1109

Sources EV-2fbe1af530b961013ca23336
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 fbbe50ac84dd7ade6de83c3369ff16c08b0590163981f18f2f529aa05bd12662

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Kedrum Solar Farm

project stage · awaiting consents

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameKedrum Solar Farm
Customer NameRosside Energy Limited
Connection SiteBlackhillock 275kV Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease150.00
Cumulative Total Capacity (MW)150.00
MW Effective From2030-05-30
Project StatusAwaiting Consents
Agreement TypeDirect Connection
HOST TOSHET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e000000TPc0AAG
Project NumberPRO-003444
GateNot obtained
Original textAwaiting Consents
source_record_idcsv:row:1109

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1109

Sources EV-2fbe1af530b961013ca23336
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 fbbe50ac84dd7ade6de83c3369ff16c08b0590163981f18f2f529aa05bd12662

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel