POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

Keithick Estate

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:7201f81ae7eb0b03dbe0efc9 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:020adb74b7f50171c394f01f
to_kindpower_object
to_idneso:connection_site:7201f81ae7eb0b03dbe0efc9
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1117

Sources EV-3d0633190a1ed28f16321618
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 1eed1793933590b41291947c380cbbe210a72fe3001003e06955f55e7c6f3272

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Keithick Estate

Connection register · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-3d0633190a1ed28f16321618
MW Increase / Decrease49.99 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-3d0633190a1ed28f16321618
Cumulative Total Capacity (MW)49.99 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-3d0633190a1ed28f16321618
Detailed source fields
Original source fieldPublished value or condition
Project NameKeithick Estate
Customer NameSIRIUS ECODEV (STIRLING) LTD
Connection SiteCoupar Angus 132/33kV GSP
StageNot obtained
MW Connected0.00
MW Increase / Decrease49.99
Cumulative Total Capacity (MW)49.99
MW Effective From2026-12-31
Project StatusUnder Construction/Commissioning
Agreement TypeEmbedded
HOST TOSHET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l4L0000005iU3QAI
Project NumberPRO-001732
Gate2
Original textUnder Construction/Commissioning
source_record_idcsv:row:1117

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1117

Sources EV-3d0633190a1ed28f16321618
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 1eed1793933590b41291947c380cbbe210a72fe3001003e06955f55e7c6f3272

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_tec

Keithick Estate

project stage · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameKeithick Estate
Customer NameSIRIUS ECODEV (STIRLING) LTD
Connection SiteCoupar Angus 132/33kV GSP
StageNot obtained
MW Connected0.00
MW Increase / Decrease49.99
Cumulative Total Capacity (MW)49.99
MW Effective From2026-12-31
Project StatusUnder Construction/Commissioning
Agreement TypeEmbedded
HOST TOSHET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l4L0000005iU3QAI
Project NumberPRO-001732
Gate2
Original textUnder Construction/Commissioning
source_record_idcsv:row:1117

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:1117

Sources EV-3d0633190a1ed28f16321618
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 1eed1793933590b41291947c380cbbe210a72fe3001003e06955f55e7c6f3272

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel