POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Lochaber Smelter

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:36aa7b49ca6b77c6bfaf33d2 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:cd523c847712829e957d00da
to_kindpower_object
to_idneso:connection_site:36aa7b49ca6b77c6bfaf33d2
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:356

Sources EV-d99040799876f8fccb8b749d
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 3c6eee4ffc9ccdb953ff5e144c0b63ad4d0bb408dabd4399418443ebf3b14412

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Lochaber Smelter

Connection register · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-d99040799876f8fccb8b749d
MW Increase / Decrease51.9 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-d99040799876f8fccb8b749d
Cumulative Total Capacity (MW)80 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-d99040799876f8fccb8b749d
Detailed source fields
Original source fieldPublished value or condition
Project NameLochaber Smelter
Customer NameSIMEC LOCHABER HYDROPOWER 2 LIMITED
Connection SiteFort William GSP
Stage2.00
MW Connected0.00
MW Increase / Decrease51.90
Cumulative Total Capacity (MW)80.00
MW Effective From2019-10-31
Project StatusUnder Construction/Commissioning
HOST TOSHET
Plant TypeHydro
Project IDa0l4L0000005iQ6QAI
Project NumberPRO-001274-2
GateNot obtained
Original textUnder Construction/Commissioning
source_record_idcsv:row:356

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:356

Sources EV-d99040799876f8fccb8b749d
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 3c6eee4ffc9ccdb953ff5e144c0b63ad4d0bb408dabd4399418443ebf3b14412

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Lochaber Smelter

project stage · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameLochaber Smelter
Customer NameSIMEC LOCHABER HYDROPOWER 2 LIMITED
Connection SiteFort William GSP
Stage2.00
MW Connected0.00
MW Increase / Decrease51.90
Cumulative Total Capacity (MW)80.00
MW Effective From2019-10-31
Project StatusUnder Construction/Commissioning
HOST TOSHET
Plant TypeHydro
Project IDa0l4L0000005iQ6QAI
Project NumberPRO-001274-2
GateNot obtained
Original textUnder Construction/Commissioning
source_record_idcsv:row:356

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:356

Sources EV-d99040799876f8fccb8b749d
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 3c6eee4ffc9ccdb953ff5e144c0b63ad4d0bb408dabd4399418443ebf3b14412

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel