POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Fairburn Wind Farm

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:78adb806cc2ae0fb123726c5 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:cb02e9bd9dd794cbac282672
to_kindpower_object
to_idneso:connection_site:78adb806cc2ae0fb123726c5
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:218

Sources EV-63cee1147d964e0f3a9f424b
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 61cc827ccb0daf79671a8ca5c352cb82fbfebee292c28a3bc7e6f727d39b8255

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Fairburn Wind Farm

Connection register · built

Metric or conditionSource valueBasis, scope and stage
MW Connected40 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-63cee1147d964e0f3a9f424b
MW Increase / Decrease0 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-63cee1147d964e0f3a9f424b
Cumulative Total Capacity (MW)40 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-63cee1147d964e0f3a9f424b
Detailed source fields
Original source fieldPublished value or condition
Project NameFairburn Wind Farm
Customer NameSSE GENERATION LIMITED
Connection SiteOrrin (Fairburn) GSP
StageNot obtained
MW Connected40.00
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)40.00
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSHET
Plant TypeWind Onshore
Project IDa0l4L0000005iRpQAI
Project NumberPRO-000931
GateNot obtained
Original textBuilt
source_record_idcsv:row:218

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:218

Sources EV-63cee1147d964e0f3a9f424b
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 61cc827ccb0daf79671a8ca5c352cb82fbfebee292c28a3bc7e6f727d39b8255

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Fairburn Wind Farm

project stage · built

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameFairburn Wind Farm
Customer NameSSE GENERATION LIMITED
Connection SiteOrrin (Fairburn) GSP
StageNot obtained
MW Connected40.00
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)40.00
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSHET
Plant TypeWind Onshore
Project IDa0l4L0000005iRpQAI
Project NumberPRO-000931
GateNot obtained
Original textBuilt
source_record_idcsv:row:218

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:218

Sources EV-63cee1147d964e0f3a9f424b
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 61cc827ccb0daf79671a8ca5c352cb82fbfebee292c28a3bc7e6f727d39b8255

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel