POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Camilla Farm

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:7a1452f0280871f0b6a231c0 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:b8606612bd6d74a8707d90b8
to_kindpower_object
to_idneso:connection_site:7a1452f0280871f0b6a231c0
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:115

Sources EV-8d21bff617901a8c44d2fcdc
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 ef86cc0bd6d7ee91f17c47d666c97167b03197aac8287f967611e8e791b9a7cb

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Camilla Farm

Connection register · built

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-8d21bff617901a8c44d2fcdc
MW Increase / Decrease49.95 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-8d21bff617901a8c44d2fcdc
Cumulative Total Capacity (MW)49.95 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-8d21bff617901a8c44d2fcdc
Detailed source fields
Original source fieldPublished value or condition
Project NameCamilla Farm
Customer NameNEXTPOWER EELPOWER CAMILLA LIMITED
Connection SiteGlenniston GSP
StageNot obtained
MW Connected0.00
MW Increase / Decrease49.95
Cumulative Total Capacity (MW)49.95
MW Effective From2022-02-15
Project StatusBuilt
HOST TOSPT
Plant TypeEnergy Storage System
Project IDa0l4L0000005iQzQAI
Project NumberPRO-000886
GateNot obtained
Original textBuilt
source_record_idcsv:row:115

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:115

Sources EV-8d21bff617901a8c44d2fcdc
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 ef86cc0bd6d7ee91f17c47d666c97167b03197aac8287f967611e8e791b9a7cb

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Camilla Farm

project stage · built

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameCamilla Farm
Customer NameNEXTPOWER EELPOWER CAMILLA LIMITED
Connection SiteGlenniston GSP
StageNot obtained
MW Connected0.00
MW Increase / Decrease49.95
Cumulative Total Capacity (MW)49.95
MW Effective From2022-02-15
Project StatusBuilt
HOST TOSPT
Plant TypeEnergy Storage System
Project IDa0l4L0000005iQzQAI
Project NumberPRO-000886
GateNot obtained
Original textBuilt
source_record_idcsv:row:115

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:115

Sources EV-8d21bff617901a8c44d2fcdc
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 ef86cc0bd6d7ee91f17c47d666c97167b03197aac8287f967611e8e791b9a7cb

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel