POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Blackpark Battery Storage

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:5c267a4cf2a34ec5fefee490 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:ab985f4a3eee0c88cf3a93c4
to_kindpower_object
to_idneso:connection_site:5c267a4cf2a34ec5fefee490
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:70

Sources EV-fb80143a63089afe16286481
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 3be27c24010b7cc952d978fc2f25150c2aff4b5b545c2d4477551e6b3f340539

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Blackpark Battery Storage

Connection register · consented

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Consents Approved
As-of date 2026-10-01
Sources EV-fb80143a63089afe16286481
MW Increase / Decrease49.9 MWOriginal source column definition · project stage · Consents Approved
As-of date 2026-10-01
Sources EV-fb80143a63089afe16286481
Cumulative Total Capacity (MW)49.9 MWOriginal source column definition · project stage · Consents Approved
As-of date 2026-10-01
Sources EV-fb80143a63089afe16286481
Detailed source fields
Original source fieldPublished value or condition
Project NameBlackpark Battery Storage
Customer NameBLACKPARK ENERGY STORAGE LIMITED
Connection SiteNairn 132/33kV Grid Supply Point Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease49.90
Cumulative Total Capacity (MW)49.90
MW Effective From2027-06-30
Project StatusConsents Approved
HOST TOSHET
Plant TypeEnergy Storage System
Project IDa0l4L0000005iRlQAI
Project NumberPRO-000935
Gate2
Original textConsents Approved
source_record_idcsv:row:70

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:70

Sources EV-fb80143a63089afe16286481
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 3be27c24010b7cc952d978fc2f25150c2aff4b5b545c2d4477551e6b3f340539

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Blackpark Battery Storage

project stage · consented

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameBlackpark Battery Storage
Customer NameBLACKPARK ENERGY STORAGE LIMITED
Connection SiteNairn 132/33kV Grid Supply Point Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease49.90
Cumulative Total Capacity (MW)49.90
MW Effective From2027-06-30
Project StatusConsents Approved
HOST TOSHET
Plant TypeEnergy Storage System
Project IDa0l4L0000005iRlQAI
Project NumberPRO-000935
Gate2
Original textConsents Approved
source_record_idcsv:row:70

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:70

Sources EV-fb80143a63089afe16286481
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 3be27c24010b7cc952d978fc2f25150c2aff4b5b545c2d4477551e6b3f340539

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel