POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Golspie Business Park

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:4d235ef77e811ef700592f31 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:9410e69ad507902af65a1298
to_kindpower_object
to_idneso:connection_site:4d235ef77e811ef700592f31
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:262

Sources EV-6f64a27ae4a7c056b726d808
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 10606db5c2bbe462857935f16337854f814dc6510cdc154fad288afd9c0ed558

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Golspie Business Park

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-6f64a27ae4a7c056b726d808
MW Increase / Decrease0.06 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-6f64a27ae4a7c056b726d808
Cumulative Total Capacity (MW)0.06 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-6f64a27ae4a7c056b726d808
Detailed source fields
Original source fieldPublished value or condition
Project NameGolspie Business Park
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteBrora GSP
StageNot obtained
MW Connected0.00
MW Increase / Decrease0.06
Cumulative Total Capacity (MW)0.06
MW Effective From2024-03-08
Project StatusScoping
HOST TOSHET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e0000011yBqAAI
Project NumberPRO-003507
GateNot obtained
Original textScoping
source_record_idcsv:row:262

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:262

Sources EV-6f64a27ae4a7c056b726d808
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 10606db5c2bbe462857935f16337854f814dc6510cdc154fad288afd9c0ed558

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Golspie Business Park

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameGolspie Business Park
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteBrora GSP
StageNot obtained
MW Connected0.00
MW Increase / Decrease0.06
Cumulative Total Capacity (MW)0.06
MW Effective From2024-03-08
Project StatusScoping
HOST TOSHET
Plant TypeEnergy Storage System;PV Array (Photo Voltaic/solar)
Project IDa0l8e0000011yBqAAI
Project NumberPRO-003507
GateNot obtained
Original textScoping
source_record_idcsv:row:262

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:262

Sources EV-6f64a27ae4a7c056b726d808
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 10606db5c2bbe462857935f16337854f814dc6510cdc154fad288afd9c0ed558

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel