POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Burnhead Wind Farm

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:4a455cfeb0fd8ef6c61be268 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:8d96ac866ac106589990c03d
to_kindpower_object
to_idneso:connection_site:4a455cfeb0fd8ef6c61be268
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:100

Sources EV-a6aab5a7e3980fccd77bc055
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 d8ad545049e428b03603e8784bcb8a41a146c97dd2fbe33aaefa8d599085f1f1

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Burnhead Wind Farm

Connection register · built

Metric or conditionSource valueBasis, scope and stage
MW Connected29.5 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-a6aab5a7e3980fccd77bc055
MW Increase / Decrease0 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-a6aab5a7e3980fccd77bc055
Cumulative Total Capacity (MW)29.5 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-a6aab5a7e3980fccd77bc055
Detailed source fields
Original source fieldPublished value or condition
Project NameBurnhead Wind Farm
Customer NameSP DISTRIBUTION PLC
Connection SiteBathgate 132/33kV
StageNot obtained
MW Connected29.50
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)29.50
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSPT
Plant TypeWind Onshore
Project IDa0l4L0000005igiQAA
Project NumberPRO-000737
GateNot obtained
Original textBuilt
source_record_idcsv:row:100

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:100

Sources EV-a6aab5a7e3980fccd77bc055
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 d8ad545049e428b03603e8784bcb8a41a146c97dd2fbe33aaefa8d599085f1f1

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Burnhead Wind Farm

project stage · built

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameBurnhead Wind Farm
Customer NameSP DISTRIBUTION PLC
Connection SiteBathgate 132/33kV
StageNot obtained
MW Connected29.50
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)29.50
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSPT
Plant TypeWind Onshore
Project IDa0l4L0000005igiQAA
Project NumberPRO-000737
GateNot obtained
Original textBuilt
source_record_idcsv:row:100

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:100

Sources EV-a6aab5a7e3980fccd77bc055
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 d8ad545049e428b03603e8784bcb8a41a146c97dd2fbe33aaefa8d599085f1f1

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel