POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Bunloinn Wind Farm BELLA

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:20b5c6c24d424ea2cbd7bf62 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:868e9c248dc8df5cbcfeb3db
to_kindpower_object
to_idneso:connection_site:20b5c6c24d424ea2cbd7bf62
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:92

Sources EV-340eb4aad0e6190cedd2a799
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 8503b220e71c13fae8f274220102654a2fdda2d78098ce4cf7694fca492f8f66

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Bunloinn Wind Farm BELLA

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-340eb4aad0e6190cedd2a799
MW Increase / Decrease71.6 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-340eb4aad0e6190cedd2a799
Cumulative Total Capacity (MW)71.6 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-340eb4aad0e6190cedd2a799
Detailed source fields
Original source fieldPublished value or condition
Project NameBunloinn Wind Farm BELLA
Customer NameENERGYFARM BUNLOINN LLP
Connection SiteFort Augustus GSP/New Fort Augustus GSP
StageNot obtained
MW Connected0.00
MW Increase / Decrease71.60
Cumulative Total Capacity (MW)71.60
MW Effective From2035-10-31
Project StatusScoping
HOST TOSHET
Plant TypeDemand;Energy Storage System;Wind Onshore
Project IDa0lJ9000000blUyIAI
Project NumberPRO-004878
GateNot obtained
Original textScoping
source_record_idcsv:row:92

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:92

Sources EV-340eb4aad0e6190cedd2a799
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 8503b220e71c13fae8f274220102654a2fdda2d78098ce4cf7694fca492f8f66

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Bunloinn Wind Farm BELLA

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameBunloinn Wind Farm BELLA
Customer NameENERGYFARM BUNLOINN LLP
Connection SiteFort Augustus GSP/New Fort Augustus GSP
StageNot obtained
MW Connected0.00
MW Increase / Decrease71.60
Cumulative Total Capacity (MW)71.60
MW Effective From2035-10-31
Project StatusScoping
HOST TOSHET
Plant TypeDemand;Energy Storage System;Wind Onshore
Project IDa0lJ9000000blUyIAI
Project NumberPRO-004878
GateNot obtained
Original textScoping
source_record_idcsv:row:92

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:92

Sources EV-340eb4aad0e6190cedd2a799
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 8503b220e71c13fae8f274220102654a2fdda2d78098ce4cf7694fca492f8f66

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel