POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Carbrain Gas Reserve Power Facility

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:971e17db911b9ebfc9b1968c · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:867e18a6c7ec220b1711636d
to_kindpower_object
to_idneso:connection_site:971e17db911b9ebfc9b1968c
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:119

Sources EV-6b2b558e116682c478aefc96
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 0f9fe4d43e2f2d254ab53c0503a0a2dcb8fa2f8d979e235be2a8ecbf883c3956

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Carbrain Gas Reserve Power Facility

Connection register · built

Metric or conditionSource valueBasis, scope and stage
MW Connected19.9 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-6b2b558e116682c478aefc96
MW Increase / Decrease0 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-6b2b558e116682c478aefc96
Cumulative Total Capacity (MW)19.9 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-6b2b558e116682c478aefc96
Detailed source fields
Original source fieldPublished value or condition
Project NameCarbrain Gas Reserve Power Facility
Customer NameSP DISTRIBUTION PLC
Connection SiteCumbernauld 132/33kV
StageNot obtained
MW Connected19.90
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)19.90
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSPT
Plant TypeCCGT (Combined Cycle Gas Turbine)
Project IDa0l4L0000005iN6QAI
Project NumberPRO-001208
GateNot obtained
Original textBuilt
source_record_idcsv:row:119

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:119

Sources EV-6b2b558e116682c478aefc96
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 0f9fe4d43e2f2d254ab53c0503a0a2dcb8fa2f8d979e235be2a8ecbf883c3956

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Carbrain Gas Reserve Power Facility

project stage · built

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameCarbrain Gas Reserve Power Facility
Customer NameSP DISTRIBUTION PLC
Connection SiteCumbernauld 132/33kV
StageNot obtained
MW Connected19.90
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)19.90
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSPT
Plant TypeCCGT (Combined Cycle Gas Turbine)
Project IDa0l4L0000005iN6QAI
Project NumberPRO-001208
GateNot obtained
Original textBuilt
source_record_idcsv:row:119

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:119

Sources EV-6b2b558e116682c478aefc96
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 0f9fe4d43e2f2d254ab53c0503a0a2dcb8fa2f8d979e235be2a8ecbf883c3956

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel