POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

St Fergus Energy Park

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:251260b7ccb9c6eb54f0714f · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:867bd42f2ba655ff69d8e995
to_kindpower_object
to_idneso:connection_site:251260b7ccb9c6eb54f0714f
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:495

Sources EV-7e14ca264f5b4d454badc6cd
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 c544131d373fb682a0833db236da01ea656899403f107e28fa0d7b818afcfc70

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

St Fergus Energy Park

Connection register · consented

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Consents Approved
As-of date 2026-10-01
Sources EV-7e14ca264f5b4d454badc6cd
MW Increase / Decrease9.7 MWOriginal source column definition · project stage · Consents Approved
As-of date 2026-10-01
Sources EV-7e14ca264f5b4d454badc6cd
Cumulative Total Capacity (MW)9.7 MWOriginal source column definition · project stage · Consents Approved
As-of date 2026-10-01
Sources EV-7e14ca264f5b4d454badc6cd
Detailed source fields
Original source fieldPublished value or condition
Project NameSt Fergus Energy Park
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteSt Fergus Gas GSP
StageNot obtained
MW Connected0.00
MW Increase / Decrease9.70
Cumulative Total Capacity (MW)9.70
MW Effective From2023-09-08
Project StatusConsents Approved
HOST TOSHET
Plant TypePV Array (Photo Voltaic/solar);Wind Onshore
Project IDa0l4L0000005ibvQAA
Project NumberPRO-001449
GateNot obtained
Original textConsents Approved
source_record_idcsv:row:495

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:495

Sources EV-7e14ca264f5b4d454badc6cd
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 c544131d373fb682a0833db236da01ea656899403f107e28fa0d7b818afcfc70

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

St Fergus Energy Park

project stage · consented

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameSt Fergus Energy Park
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteSt Fergus Gas GSP
StageNot obtained
MW Connected0.00
MW Increase / Decrease9.70
Cumulative Total Capacity (MW)9.70
MW Effective From2023-09-08
Project StatusConsents Approved
HOST TOSHET
Plant TypePV Array (Photo Voltaic/solar);Wind Onshore
Project IDa0l4L0000005ibvQAA
Project NumberPRO-001449
GateNot obtained
Original textConsents Approved
source_record_idcsv:row:495

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:495

Sources EV-7e14ca264f5b4d454badc6cd
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 c544131d373fb682a0833db236da01ea656899403f107e28fa0d7b818afcfc70

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel