POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Allt Cheanna Mhuir Hydro Generating Station

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:36aa7b49ca6b77c6bfaf33d2 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:7f052e2cd77fcbf5400d7d68
to_kindpower_object
to_idneso:connection_site:36aa7b49ca6b77c6bfaf33d2
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:13

Sources EV-eced005b562013e8fcbd170e
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 43350d98d5036eb71e4ac68b2cedf7b7d8604423d2e68459c281be6a96b3f5d6

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Allt Cheanna Mhuir Hydro Generating Station

Connection register · built

Metric or conditionSource valueBasis, scope and stage
MW Connected1.75 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-eced005b562013e8fcbd170e
MW Increase / Decrease0 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-eced005b562013e8fcbd170e
Cumulative Total Capacity (MW)1.75 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-eced005b562013e8fcbd170e
Detailed source fields
Original source fieldPublished value or condition
Project NameAllt Cheanna Mhuir Hydro Generating Station
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteFort William GSP
StageNot obtained
MW Connected1.75
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)1.75
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSHET
Plant TypeHydro
Project IDa0l4L0000005iqaQAA
Project NumberPRO-000614
GateNot obtained
Original textBuilt
source_record_idcsv:row:13

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:13

Sources EV-eced005b562013e8fcbd170e
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 43350d98d5036eb71e4ac68b2cedf7b7d8604423d2e68459c281be6a96b3f5d6

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Allt Cheanna Mhuir Hydro Generating Station

project stage · built

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameAllt Cheanna Mhuir Hydro Generating Station
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteFort William GSP
StageNot obtained
MW Connected1.75
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)1.75
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSHET
Plant TypeHydro
Project IDa0l4L0000005iqaQAA
Project NumberPRO-000614
GateNot obtained
Original textBuilt
source_record_idcsv:row:13

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:13

Sources EV-eced005b562013e8fcbd170e
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 43350d98d5036eb71e4ac68b2cedf7b7d8604423d2e68459c281be6a96b3f5d6

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel