Woodbank Wind Farm

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:ea819583c6374268bcf2a56f · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:7de877f7277f9fe38cf81fe8
to_kindpower_object
to_idneso:connection_site:ea819583c6374268bcf2a56f
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:555

Sources EV-889d01fd975945eb350e3f5a
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 b7db27b4b80685c797d8e8934cf3b07b127a9efdce0ce79b9cd28db05834f933

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Woodbank Wind Farm

Connection register · built

Metric or conditionSource valueBasis, scope and stage
MW Connected1.5 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-889d01fd975945eb350e3f5a
MW Increase / Decrease0 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-889d01fd975945eb350e3f5a
Cumulative Total Capacity (MW)1.5 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-889d01fd975945eb350e3f5a
Detailed source fields
Original source fieldPublished value or condition
Project NameWoodbank Wind Farm
Customer NameSP DISTRIBUTION PLC
Connection SiteLeven GSP
StageNot obtained
MW Connected1.50
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)1.50
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSPT
Plant TypeWind Onshore
Project IDa0l4L0000005iOPQAY
Project NumberPRO-000858
GateNot obtained
Original textBuilt
source_record_idcsv:row:555

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:555

Sources EV-889d01fd975945eb350e3f5a
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 b7db27b4b80685c797d8e8934cf3b07b127a9efdce0ce79b9cd28db05834f933

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Woodbank Wind Farm

project stage · built

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameWoodbank Wind Farm
Customer NameSP DISTRIBUTION PLC
Connection SiteLeven GSP
StageNot obtained
MW Connected1.50
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)1.50
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSPT
Plant TypeWind Onshore
Project IDa0l4L0000005iOPQAY
Project NumberPRO-000858
GateNot obtained
Original textBuilt
source_record_idcsv:row:555

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:555

Sources EV-889d01fd975945eb350e3f5a
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 b7db27b4b80685c797d8e8934cf3b07b127a9efdce0ce79b9cd28db05834f933

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel