POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Hill of Lybster Wind Generating Station

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:7a860c8d167b88cd5ebf366a · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:6ac82b687e28fdc19a819620
to_kindpower_object
to_idneso:connection_site:7a860c8d167b88cd5ebf366a
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:287

Sources EV-301ff0ff4072aada836e54c9
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 c55138c4701df32a6a940cbdfe1098ebeeeb74735190aebc9ecbc800532871fd

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Hill of Lybster Wind Generating Station

Connection register · consented

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Consents Approved
As-of date 2026-10-01
Sources EV-301ff0ff4072aada836e54c9
MW Increase / Decrease1.5 MWOriginal source column definition · project stage · Consents Approved
As-of date 2026-10-01
Sources EV-301ff0ff4072aada836e54c9
Cumulative Total Capacity (MW)1.5 MWOriginal source column definition · project stage · Consents Approved
As-of date 2026-10-01
Sources EV-301ff0ff4072aada836e54c9
Detailed source fields
Original source fieldPublished value or condition
Project NameHill of Lybster Wind Generating Station
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteDounreay GSP
StageNot obtained
MW Connected0.00
MW Increase / Decrease1.50
Cumulative Total Capacity (MW)1.50
MW Effective From2023-04-30
Project StatusConsents Approved
HOST TOSHET
Plant TypeWind Onshore
Project IDa0l4L0000005isYQAQ
Project NumberPRO-000667
GateNot obtained
Original textConsents Approved
source_record_idcsv:row:287

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:287

Sources EV-301ff0ff4072aada836e54c9
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 c55138c4701df32a6a940cbdfe1098ebeeeb74735190aebc9ecbc800532871fd

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Hill of Lybster Wind Generating Station

project stage · consented

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameHill of Lybster Wind Generating Station
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteDounreay GSP
StageNot obtained
MW Connected0.00
MW Increase / Decrease1.50
Cumulative Total Capacity (MW)1.50
MW Effective From2023-04-30
Project StatusConsents Approved
HOST TOSHET
Plant TypeWind Onshore
Project IDa0l4L0000005isYQAQ
Project NumberPRO-000667
GateNot obtained
Original textConsents Approved
source_record_idcsv:row:287

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:287

Sources EV-301ff0ff4072aada836e54c9
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 c55138c4701df32a6a940cbdfe1098ebeeeb74735190aebc9ecbc800532871fd

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel