POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

St Fillans

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:9129792603740dca964b2e91 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:609da16afbf0eb1cc3604af4
to_kindpower_object
to_idneso:connection_site:9129792603740dca964b2e91
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:497

Sources EV-efd72540811ed3c2ae55f6ca
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 5cebb1e58af3a06d6feee66d99a05a829ad2c5d4d74f1f7d2877c885d76cfad9

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

St Fillans

Connection register · built

Metric or conditionSource valueBasis, scope and stage
MW Connected16.8 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-efd72540811ed3c2ae55f6ca
MW Increase / Decrease0 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-efd72540811ed3c2ae55f6ca
Cumulative Total Capacity (MW)16.8 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-efd72540811ed3c2ae55f6ca
Detailed source fields
Original source fieldPublished value or condition
Project NameSt Fillans
Customer NameSSE GENERATION LIMITED
Connection SiteSt Fillans GSP
StageNot obtained
MW Connected16.80
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)16.80
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSHET
Plant TypeHydro
Project IDa0l4L0000005iRxQAI
Project NumberPRO-000923
GateNot obtained
Original textBuilt
source_record_idcsv:row:497

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:497

Sources EV-efd72540811ed3c2ae55f6ca
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 5cebb1e58af3a06d6feee66d99a05a829ad2c5d4d74f1f7d2877c885d76cfad9

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

St Fillans

project stage · built

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameSt Fillans
Customer NameSSE GENERATION LIMITED
Connection SiteSt Fillans GSP
StageNot obtained
MW Connected16.80
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)16.80
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSHET
Plant TypeHydro
Project IDa0l4L0000005iRxQAI
Project NumberPRO-000923
GateNot obtained
Original textBuilt
source_record_idcsv:row:497

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:497

Sources EV-efd72540811ed3c2ae55f6ca
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 5cebb1e58af3a06d6feee66d99a05a829ad2c5d4d74f1f7d2877c885d76cfad9

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel