POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Rannoch

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:6b0c64a95ccf75d6b924188a · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:53b63fc225ee3d33b2b8ae6d
to_kindpower_object
to_idneso:connection_site:6b0c64a95ccf75d6b924188a
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:462

Sources EV-514abf871f0cfe3e31b0c0b5
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 71956c1ce83447ddc8fb354d79e942de80d0a66fc884b6f4cfa12be6179d1490

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Rannoch

Connection register · built

Metric or conditionSource valueBasis, scope and stage
MW Connected44 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-514abf871f0cfe3e31b0c0b5
MW Increase / Decrease0 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-514abf871f0cfe3e31b0c0b5
Cumulative Total Capacity (MW)44 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-514abf871f0cfe3e31b0c0b5
Detailed source fields
Original source fieldPublished value or condition
Project NameRannoch
Customer NameSSE GENERATION LIMITED
Connection SiteRannoch GSP
StageNot obtained
MW Connected44.00
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)44.00
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSHET
Plant TypeHydro
Project IDa0l4L0000005iRrQAI
Project NumberPRO-000929
GateNot obtained
Original textBuilt
source_record_idcsv:row:462

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:462

Sources EV-514abf871f0cfe3e31b0c0b5
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 71956c1ce83447ddc8fb354d79e942de80d0a66fc884b6f4cfa12be6179d1490

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Rannoch

project stage · built

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameRannoch
Customer NameSSE GENERATION LIMITED
Connection SiteRannoch GSP
StageNot obtained
MW Connected44.00
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)44.00
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSHET
Plant TypeHydro
Project IDa0l4L0000005iRrQAI
Project NumberPRO-000929
GateNot obtained
Original textBuilt
source_record_idcsv:row:462

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:462

Sources EV-514abf871f0cfe3e31b0c0b5
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 71956c1ce83447ddc8fb354d79e942de80d0a66fc884b6f4cfa12be6179d1490

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel