POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Attadale Hydro

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:1782fc4c8ebb2436a23eeca7 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:4746b5db8611698efc51f025
to_kindpower_object
to_idneso:connection_site:1782fc4c8ebb2436a23eeca7
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:24

Sources EV-646beea3aba4c5616d9cc86a
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 ce337d7e46a6101fdca7cc6575a6bcd5617070ccb7042ba1da99024b17e6f8cd

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Attadale Hydro

Connection register · built

Metric or conditionSource valueBasis, scope and stage
MW Connected3.5 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-646beea3aba4c5616d9cc86a
MW Increase / Decrease0 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-646beea3aba4c5616d9cc86a
Cumulative Total Capacity (MW)3.5 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-646beea3aba4c5616d9cc86a
Detailed source fields
Original source fieldPublished value or condition
Project NameAttadale Hydro
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteGrudie Bridge GSP
StageNot obtained
MW Connected3.50
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)3.50
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSHET
Plant TypeHydro
Project IDa0l4L0000005iqvQAA
Project NumberPRO-000603
GateNot obtained
Original textBuilt
source_record_idcsv:row:24

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:24

Sources EV-646beea3aba4c5616d9cc86a
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 ce337d7e46a6101fdca7cc6575a6bcd5617070ccb7042ba1da99024b17e6f8cd

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Attadale Hydro

project stage · built

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameAttadale Hydro
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteGrudie Bridge GSP
StageNot obtained
MW Connected3.50
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)3.50
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSHET
Plant TypeHydro
Project IDa0l4L0000005iqvQAA
Project NumberPRO-000603
GateNot obtained
Original textBuilt
source_record_idcsv:row:24

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:24

Sources EV-646beea3aba4c5616d9cc86a
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 ce337d7e46a6101fdca7cc6575a6bcd5617070ccb7042ba1da99024b17e6f8cd

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel