POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Milton of Fisherie Wind Generating Station

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:f3bdd73a038f6fb7f168fa5c · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:4042efe1153d8b7a1706bea8
to_kindpower_object
to_idneso:connection_site:f3bdd73a038f6fb7f168fa5c
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:390

Sources EV-dbcacb896bbc72c8665ef22b
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 c98abbeffe26525ce6e88f48219a717969225b487062da33bccd1f8f5e2e9f9b

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Milton of Fisherie Wind Generating Station

Connection register · built

Metric or conditionSource valueBasis, scope and stage
MW Connected4.6 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-dbcacb896bbc72c8665ef22b
MW Increase / Decrease0 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-dbcacb896bbc72c8665ef22b
Cumulative Total Capacity (MW)4.6 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-dbcacb896bbc72c8665ef22b
Detailed source fields
Original source fieldPublished value or condition
Project NameMilton of Fisherie Wind Generating Station
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteMacduff GSP
StageNot obtained
MW Connected4.60
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)4.60
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSHET
Plant TypeWind Onshore
Project IDa0l4L0000005idwQAA
Project NumberPRO-000674
GateNot obtained
Original textBuilt
source_record_idcsv:row:390

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:390

Sources EV-dbcacb896bbc72c8665ef22b
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 c98abbeffe26525ce6e88f48219a717969225b487062da33bccd1f8f5e2e9f9b

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Milton of Fisherie Wind Generating Station

project stage · built

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameMilton of Fisherie Wind Generating Station
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteMacduff GSP
StageNot obtained
MW Connected4.60
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)4.60
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSHET
Plant TypeWind Onshore
Project IDa0l4L0000005idwQAA
Project NumberPRO-000674
GateNot obtained
Original textBuilt
source_record_idcsv:row:390

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:390

Sources EV-dbcacb896bbc72c8665ef22b
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 c98abbeffe26525ce6e88f48219a717969225b487062da33bccd1f8f5e2e9f9b

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel