POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Tongland

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:faa23172cfc350d673f859a4 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:401acf0d58550d4b868b528f
to_kindpower_object
to_idneso:connection_site:faa23172cfc350d673f859a4
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:525

Sources EV-7bb1fdca0c5e4a8425b7ec95
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 c62202646a1efbcc6b2704eb4eb319a012376b9c012daeebac8a7cb21b7819e8

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Tongland

Connection register · built

Metric or conditionSource valueBasis, scope and stage
MW Connected33 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-7bb1fdca0c5e4a8425b7ec95
MW Increase / Decrease0 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-7bb1fdca0c5e4a8425b7ec95
Cumulative Total Capacity (MW)33 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-7bb1fdca0c5e4a8425b7ec95
Detailed source fields
Original source fieldPublished value or condition
Project NameTongland
Customer NameDrax River Hydro Limited
Connection SiteTongland 132/11kV
StageNot obtained
MW Connected33.00
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)33.00
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSPT
Plant TypeHydro
Project IDa0l4L0000005iRzQAI
Project NumberPRO-000921
GateNot obtained
Original textBuilt
source_record_idcsv:row:525

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:525

Sources EV-7bb1fdca0c5e4a8425b7ec95
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 c62202646a1efbcc6b2704eb4eb319a012376b9c012daeebac8a7cb21b7819e8

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Tongland

project stage · built

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameTongland
Customer NameDrax River Hydro Limited
Connection SiteTongland 132/11kV
StageNot obtained
MW Connected33.00
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)33.00
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSPT
Plant TypeHydro
Project IDa0l4L0000005iRzQAI
Project NumberPRO-000921
GateNot obtained
Original textBuilt
source_record_idcsv:row:525

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:525

Sources EV-7bb1fdca0c5e4a8425b7ec95
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 c62202646a1efbcc6b2704eb4eb319a012376b9c012daeebac8a7cb21b7819e8

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel