POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Loch Etive Hydro

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:f5ff8e28b6cfa8927793102c · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:32ac5d5843a1e921a80be046
to_kindpower_object
to_idneso:connection_site:f5ff8e28b6cfa8927793102c
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:351

Sources EV-bad8dfd9bf27f30c389b0bca
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 f78770fd67d1eaaff9225610fdf0e48328c8d7d3139ffa518405a30c5a57ea58

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Loch Etive Hydro

Connection register · built

Metric or conditionSource valueBasis, scope and stage
MW Connected6.8 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-bad8dfd9bf27f30c389b0bca
MW Increase / Decrease0 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-bad8dfd9bf27f30c389b0bca
Cumulative Total Capacity (MW)6.8 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-bad8dfd9bf27f30c389b0bca
Detailed source fields
Original source fieldPublished value or condition
Project NameLoch Etive Hydro
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteTaynuilt GSP
StageNot obtained
MW Connected6.80
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)6.80
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSHET
Plant TypeHydro
Project IDa0l4L0000005icXQAQ
Project NumberPRO-000686
GateNot obtained
Original textBuilt
source_record_idcsv:row:351

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:351

Sources EV-bad8dfd9bf27f30c389b0bca
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 f78770fd67d1eaaff9225610fdf0e48328c8d7d3139ffa518405a30c5a57ea58

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Loch Etive Hydro

project stage · built

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameLoch Etive Hydro
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteTaynuilt GSP
StageNot obtained
MW Connected6.80
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)6.80
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSHET
Plant TypeHydro
Project IDa0l4L0000005icXQAQ
Project NumberPRO-000686
GateNot obtained
Original textBuilt
source_record_idcsv:row:351

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:351

Sources EV-bad8dfd9bf27f30c389b0bca
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 f78770fd67d1eaaff9225610fdf0e48328c8d7d3139ffa518405a30c5a57ea58

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel