POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Newarthill GSP

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:376eb2fb080a6bffa812de22 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:20a702ae272f8132d6b2a3ca
to_kindpower_object
to_idneso:connection_site:376eb2fb080a6bffa812de22
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:420

Sources EV-a335a1ab272d141f8f84c718
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 e3376576a660cd30ee89ec0771d4ab2a5caaee4827c68791eda83083a006efd3

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Newarthill GSP

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-a335a1ab272d141f8f84c718
MW Increase / Decrease20 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-a335a1ab272d141f8f84c718
Cumulative Total Capacity (MW)20 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-a335a1ab272d141f8f84c718
Detailed source fields
Original source fieldPublished value or condition
Project NameNewarthill GSP
Customer NameSP DISTRIBUTION PLC
Connection SiteNewarthill 275/33kV
Stage1.00
MW Connected0.00
MW Increase / Decrease20.00
Cumulative Total Capacity (MW)20.00
MW Effective From2028-04-28
Project StatusScoping
HOST TOSPT
Plant TypeEnergy Storage System
Project IDa0lJ9000000blJiIAI
Project NumberPRO-004795-1
GateNot obtained
Original textScoping
source_record_idcsv:row:420

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:420

Sources EV-a335a1ab272d141f8f84c718
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 e3376576a660cd30ee89ec0771d4ab2a5caaee4827c68791eda83083a006efd3

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Newarthill GSP

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameNewarthill GSP
Customer NameSP DISTRIBUTION PLC
Connection SiteNewarthill 275/33kV
Stage1.00
MW Connected0.00
MW Increase / Decrease20.00
Cumulative Total Capacity (MW)20.00
MW Effective From2028-04-28
Project StatusScoping
HOST TOSPT
Plant TypeEnergy Storage System
Project IDa0lJ9000000blJiIAI
Project NumberPRO-004795-1
GateNot obtained
Original textScoping
source_record_idcsv:row:420

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:420

Sources EV-a335a1ab272d141f8f84c718
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 e3376576a660cd30ee89ec0771d4ab2a5caaee4827c68791eda83083a006efd3

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel