POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Wheedlemont

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:10d8163bb1260d861263cc81 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:2080587df654f6b855746078
to_kindpower_object
to_idneso:connection_site:10d8163bb1260d861263cc81
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:554

Sources EV-621c94591a9f613e282f71ea
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 2c14127abe8840e52d8d0c0f6200ec1a508d79137039c00a632b4cca5da0d01f

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Wheedlemont

Connection register · built

Metric or conditionSource valueBasis, scope and stage
MW Connected1.7 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-621c94591a9f613e282f71ea
MW Increase / Decrease0 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-621c94591a9f613e282f71ea
Cumulative Total Capacity (MW)1.7 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-621c94591a9f613e282f71ea
Detailed source fields
Original source fieldPublished value or condition
Project NameWheedlemont
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteKeith GSP
StageNot obtained
MW Connected1.70
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)1.70
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSHET
Plant TypeWind Onshore
Project IDa0l4L0000005ifBQAQ
Project NumberPRO-000710
GateNot obtained
Original textBuilt
source_record_idcsv:row:554

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:554

Sources EV-621c94591a9f613e282f71ea
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 2c14127abe8840e52d8d0c0f6200ec1a508d79137039c00a632b4cca5da0d01f

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Wheedlemont

project stage · built

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameWheedlemont
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteKeith GSP
StageNot obtained
MW Connected1.70
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)1.70
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSHET
Plant TypeWind Onshore
Project IDa0l4L0000005ifBQAQ
Project NumberPRO-000710
GateNot obtained
Original textBuilt
source_record_idcsv:row:554

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:554

Sources EV-621c94591a9f613e282f71ea
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 2c14127abe8840e52d8d0c0f6200ec1a508d79137039c00a632b4cca5da0d01f

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel