POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Barr River Hydro

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:36aa7b49ca6b77c6bfaf33d2 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:1e89519dd1b049332bf8cfbd
to_kindpower_object
to_idneso:connection_site:36aa7b49ca6b77c6bfaf33d2
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:47

Sources EV-c561ea5f9949c2d01a794b50
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 766cf16c116155d39c765b49849e8b6c5bd021120c836b8908dd2483e81487be

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Barr River Hydro

Connection register · built

Metric or conditionSource valueBasis, scope and stage
MW Connected1.6 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-c561ea5f9949c2d01a794b50
MW Increase / Decrease0 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-c561ea5f9949c2d01a794b50
Cumulative Total Capacity (MW)1.6 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-c561ea5f9949c2d01a794b50
Detailed source fields
Original source fieldPublished value or condition
Project NameBarr River Hydro
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteFort William GSP
StageNot obtained
MW Connected1.60
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)1.60
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSHET
Plant TypeHydro
Project IDa0l4L0000005iT8QAI
Project NumberPRO-001001
GateNot obtained
Original textBuilt
source_record_idcsv:row:47

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:47

Sources EV-c561ea5f9949c2d01a794b50
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 766cf16c116155d39c765b49849e8b6c5bd021120c836b8908dd2483e81487be

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Barr River Hydro

project stage · built

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameBarr River Hydro
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteFort William GSP
StageNot obtained
MW Connected1.60
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)1.60
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSHET
Plant TypeHydro
Project IDa0l4L0000005iT8QAI
Project NumberPRO-001001
GateNot obtained
Original textBuilt
source_record_idcsv:row:47

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:47

Sources EV-c561ea5f9949c2d01a794b50
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 766cf16c116155d39c765b49849e8b6c5bd021120c836b8908dd2483e81487be

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel