POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Eskart Hydro

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:c59856ffc3c76d05782aef7a · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:1ac15f364d709ca9002d93e6
to_kindpower_object
to_idneso:connection_site:c59856ffc3c76d05782aef7a
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:214

Sources EV-0b3cc5c4f2ead8ccb48b9825
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 23de4b8960c735f93a0a10ceced0abc1b092a986358164a7cbe06ee1ab43a40f

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Eskart Hydro

Connection register · built

Metric or conditionSource valueBasis, scope and stage
MW Connected1.99 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-0b3cc5c4f2ead8ccb48b9825
MW Increase / Decrease0 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-0b3cc5c4f2ead8ccb48b9825
Cumulative Total Capacity (MW)1.99 MWOriginal source column definition · project stage · Built
As-of date 2026-10-01
Sources EV-0b3cc5c4f2ead8ccb48b9825
Detailed source fields
Original source fieldPublished value or condition
Project NameEskart Hydro
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteFort Augustus GSP
StageNot obtained
MW Connected1.99
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)1.99
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSHET
Plant TypeHydro
Project IDa0l4L0000005irlQAA
Project NumberPRO-000644
GateNot obtained
Original textBuilt
source_record_idcsv:row:214

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:214

Sources EV-0b3cc5c4f2ead8ccb48b9825
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 23de4b8960c735f93a0a10ceced0abc1b092a986358164a7cbe06ee1ab43a40f

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Eskart Hydro

project stage · built

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameEskart Hydro
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteFort Augustus GSP
StageNot obtained
MW Connected1.99
MW Increase / Decrease0.00
Cumulative Total Capacity (MW)1.99
MW Effective FromNot obtained
Project StatusBuilt
HOST TOSHET
Plant TypeHydro
Project IDa0l4L0000005irlQAA
Project NumberPRO-000644
GateNot obtained
Original textBuilt
source_record_idcsv:row:214

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:214

Sources EV-0b3cc5c4f2ead8ccb48b9825
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 23de4b8960c735f93a0a10ceced0abc1b092a986358164a7cbe06ee1ab43a40f

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel