POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Golticlay Wind Farm

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:5339daab3aa0141fb3b85be2 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:0ebd3fc05c117959c58ccdbe
to_kindpower_object
to_idneso:connection_site:5339daab3aa0141fb3b85be2
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:264

Sources EV-c0006810c9c4a0fe06a6138b
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 30316529bd3d0b5ed10167e7c449fab2cb98645cdeff0a45ffc9d2464ba99f5f

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Golticlay Wind Farm

Connection register · awaiting consents

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-c0006810c9c4a0fe06a6138b
MW Increase / Decrease50.07 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-c0006810c9c4a0fe06a6138b
Cumulative Total Capacity (MW)50.07 MWOriginal source column definition · project stage · Awaiting Consents
As-of date 2026-10-01
Sources EV-c0006810c9c4a0fe06a6138b
Detailed source fields
Original source fieldPublished value or condition
Project NameGolticlay Wind Farm
Customer NameRWE Renewables UK Onshore Wind Limited
Connection SiteMybster 1 132/33kV Substation
Stage1.00
MW Connected0.00
MW Increase / Decrease50.07
Cumulative Total Capacity (MW)50.07
MW Effective From2026-07-31
Project StatusAwaiting Consents
HOST TOSHET
Plant TypeWind Onshore
Project IDa0l4L0000005iUnQAI
Project NumberPRO-000370-1
Gate2
Original textAwaiting Consents
source_record_idcsv:row:264

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:264

Sources EV-c0006810c9c4a0fe06a6138b
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 30316529bd3d0b5ed10167e7c449fab2cb98645cdeff0a45ffc9d2464ba99f5f

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Golticlay Wind Farm

project stage · awaiting consents

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameGolticlay Wind Farm
Customer NameRWE Renewables UK Onshore Wind Limited
Connection SiteMybster 1 132/33kV Substation
Stage1.00
MW Connected0.00
MW Increase / Decrease50.07
Cumulative Total Capacity (MW)50.07
MW Effective From2026-07-31
Project StatusAwaiting Consents
HOST TOSHET
Plant TypeWind Onshore
Project IDa0l4L0000005iUnQAI
Project NumberPRO-000370-1
Gate2
Original textAwaiting Consents
source_record_idcsv:row:264

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:264

Sources EV-c0006810c9c4a0fe06a6138b
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 30316529bd3d0b5ed10167e7c449fab2cb98645cdeff0a45ffc9d2464ba99f5f

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel