POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Nairn Road Bravo

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:de8f1474781d9fc7553ce292 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:0c4867add3124bdbe323503f
to_kindpower_object
to_idneso:connection_site:de8f1474781d9fc7553ce292
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:407

Sources EV-f9aba7fd66b57a59f40f4011
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 832f00a9b0a5ba11564b6cdad468bbeb250156fe4c28c5b0ea6ac24d2b0aa820

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Nairn Road Bravo

Connection register · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
MW Connected4 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-f9aba7fd66b57a59f40f4011
MW Increase / Decrease4 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-f9aba7fd66b57a59f40f4011
Cumulative Total Capacity (MW)8 MWOriginal source column definition · project stage · Under Construction/Commissioning
As-of date 2026-10-01
Sources EV-f9aba7fd66b57a59f40f4011
Detailed source fields
Original source fieldPublished value or condition
Project NameNairn Road Bravo
Customer NameSP DISTRIBUTION PLC
Connection SiteDrumcross 132/33kV
StageNot obtained
MW Connected4.00
MW Increase / Decrease4.00
Cumulative Total Capacity (MW)8.00
MW Effective From2024-10-31
Project StatusUnder Construction/Commissioning
HOST TOSPT
Plant TypeCCGT (Combined Cycle Gas Turbine)
Project IDa0l4L0000005iOUQAY
Project NumberPRO-001188
GateNot obtained
Original textUnder Construction/Commissioning
source_record_idcsv:row:407

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:407

Sources EV-f9aba7fd66b57a59f40f4011
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 832f00a9b0a5ba11564b6cdad468bbeb250156fe4c28c5b0ea6ac24d2b0aa820

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Nairn Road Bravo

project stage · under construction or commissioning

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameNairn Road Bravo
Customer NameSP DISTRIBUTION PLC
Connection SiteDrumcross 132/33kV
StageNot obtained
MW Connected4.00
MW Increase / Decrease4.00
Cumulative Total Capacity (MW)8.00
MW Effective From2024-10-31
Project StatusUnder Construction/Commissioning
HOST TOSPT
Plant TypeCCGT (Combined Cycle Gas Turbine)
Project IDa0l4L0000005iOUQAY
Project NumberPRO-001188
GateNot obtained
Original textUnder Construction/Commissioning
source_record_idcsv:row:407

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:407

Sources EV-f9aba7fd66b57a59f40f4011
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 832f00a9b0a5ba11564b6cdad468bbeb250156fe4c28c5b0ea6ac24d2b0aa820

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel