POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_embedded

Beyside Portgordons Ltd Generation Station

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:831d4c0f4b330b9ad14dca82 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_embedded:02403547af56d389b2eadfe1
to_kindpower_object
to_idneso:connection_site:831d4c0f4b330b9ad14dca82
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:64

Sources EV-d7373c5ede783d07b9689c86
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 9795f741c6dd4125f62683c1af798d104b4071d1ecf3accceeafa584918c34f6

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_embedded

Beyside Portgordons Ltd Generation Station

Connection register · scoping

Metric or conditionSource valueBasis, scope and stage
MW Connected0 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-d7373c5ede783d07b9689c86
MW Increase / Decrease1.07 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-d7373c5ede783d07b9689c86
Cumulative Total Capacity (MW)1.07 MWOriginal source column definition · project stage · Scoping
As-of date 2026-10-01
Sources EV-d7373c5ede783d07b9689c86
Detailed source fields
Original source fieldPublished value or condition
Project NameBeyside Portgordons Ltd Generation Station
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteKeith 1 132/33kV GSP Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease1.07
Cumulative Total Capacity (MW)1.07
MW Effective From2024-03-31
Project StatusScoping
HOST TOSHET
Plant TypeCCGT (Combined Cycle Gas Turbine)
Project IDa0l4L0000005iQTQAY
Project NumberPRO-001886
GateNot obtained
Original textScoping
source_record_idcsv:row:64

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:64

Sources EV-d7373c5ede783d07b9689c86
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 9795f741c6dd4125f62683c1af798d104b4071d1ecf3accceeafa584918c34f6

Usage terms NESO Open Data Licence

Source snapshots by date · GBR · neso_embedded

Beyside Portgordons Ltd Generation Station

project stage · scoping

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
Project NameBeyside Portgordons Ltd Generation Station
Customer NameScottish Hydro Electric Power Distribution Plc
Connection SiteKeith 1 132/33kV GSP Substation
StageNot obtained
MW Connected0.00
MW Increase / Decrease1.07
Cumulative Total Capacity (MW)1.07
MW Effective From2024-03-31
Project StatusScoping
HOST TOSHET
Plant TypeCCGT (Combined Cycle Gas Turbine)
Project IDa0l4L0000005iQTQAY
Project NumberPRO-001886
GateNot obtained
Original textScoping
source_record_idcsv:row:64

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_embedded ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:64

Sources EV-d7373c5ede783d07b9689c86
Evidence SHA-256 2feb369e26e2a57bf5656824c32190410d8889b1e9d9a06a1bbb6c2c3e49f21b
행 SHA-256 9795f741c6dd4125f62683c1af798d104b4071d1ecf3accceeafa584918c34f6

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel