POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 3items · current page 1–3 · Source records, not unique facilities.

Evidence relationships · GBR · neso_tec

BLUE PLANET SOLAR

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:e229c348da25590d90e440c7 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:6f1e3365df1bff702f845593
to_kindpower_object
to_idneso:connection_site:e229c348da25590d90e440c7
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:217

Sources EV-2ee20e1f4b19436248dd5120
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 04ba8cfe0cd8a701624a970e8a128e29b2269ac7ebb43c023e322e58a5c3b105

Usage terms NESO Open Data Licence

Power assets and projects · GBR · neso_tec

Dungeness 400kV Substation

Connection-site name reference · Unverified

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
source_record_idDungeness 400kV Substation

No separate metric summary is available. Consult the detailed source fields.

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 2items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:217

Sources EV-2ee20e1f4b19436248dd5120
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 04ba8cfe0cd8a701624a970e8a128e29b2269ac7ebb43c023e322e58a5c3b105

Usage terms NESO Open Data Licence

neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:639

Sources EV-321f129454da927eba4a3beb
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 cffc3ca10ae2e656661004598c151aaa00a616c6761dbc0eded520c8354994b4

Usage terms NESO Open Data Licence

Evidence relationships · GBR · neso_tec

Dungeness Energy Park

Not obtained · Source-stated

Relationship status: Source-stated · Registered connection site
Related record neso:connection_site:e229c348da25590d90e440c7 · Relationship evidence

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
from_kindpower_object
from_idneso_tec:4b1e24c86a5f464356aed4cc
to_kindpower_object
to_idneso:connection_site:e229c348da25590d90e440c7
geometry_relationfalse

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
neso_tec ↗

Data Source 2026-10-01 · Retrieved 2026-10-05

Supported by National Energy SO Open Data

Source location csv:row:639

Sources EV-321f129454da927eba4a3beb
Evidence SHA-256 608bac089ceb3fb74f111ee68b68a6f6e44189007e48e8d6ab5410cc48b12480
행 SHA-256 cffc3ca10ae2e656661004598c151aaa00a616c6761dbc0eded520c8354994b4

Usage terms NESO Open Data Licence

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel