POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 5items · current page 1–5 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 부여#2분기 전력구 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-0fc7006568f234c5105ca76f
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_c5891c5b8829e8f6
stable_project_keyprjtDef:234785:ESB
project_definition234785
first_region_codeESB
manual_source_formatfalse
project_name154kV 부여#2분기 전력구 건설사업
project_name_list154kV 부여#2분기 전력구 건설사업
purpose부여지역 재생E 연계용량 확보
project_region_detail충청남도 부여군
project_period_raw2026.02~2032.10
project_scale_rawXLPE2000 × 4C, L=2.4KM
responsible_office_raw중부건설본부/직할
equipment_type전력구
headquarters중부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_1c8bb957fffaf63d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_c5891c5b8829e8f6

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_c5891c5b8829e8f6

Sources EV-0fc7006568f234c5105ca76f
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 c642b7220eebb80848721aac406fb1dad2eb93e2979091a006407087d4c667ed
Source schedule candidates · KOR · kepco_planned

154kV 부여#2분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2032-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234785|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1c8bb957fffaf63d

Sources EV-40ce71dd946788069846fcc6
Evidence SHA-256 2f093eb679886d50a259db2393f6c754b00837ca2dfdf5a36aee510a6ff439d0
행 SHA-256 1c82583183781864954e4facee87e378cec209b56d49226d4c6cda379c92f62e
Source schedule candidates · KOR · kepco_planned

154kV 부여#2분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2026-02
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|234785|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1c8bb957fffaf63d

Sources EV-40ce71dd946788069846fcc6
Evidence SHA-256 2f093eb679886d50a259db2393f6c754b00837ca2dfdf5a36aee510a6ff439d0
행 SHA-256 1c82583183781864954e4facee87e378cec209b56d49226d4c6cda379c92f62e
Source snapshots by date · KOR · kepco_planned

154kV 부여#2분기 전력구 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_1c8bb957fffaf63d
stable_project_idkproj_c5891c5b8829e8f6
source_key202609|234785|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 부여#2분기 전력구 건설사업
project_name_detail154kV 부여#2분기 전력구 건설사업
region_summary_raw충청남도 부여군등 1 지역
equipment_type_raw전력구
headquarters_raw중부건설본부
office_raw직할
section_fields
Project purpose
  • 부여지역 재생E 연계용량 확보
Project region
  • 충청남도 부여군
Project period
  • 2026.02~2032.10
사업 규모
  • XLPE2000 × 4C, L=2.4KM
담당 사업소
  • 중부건설본부/직할
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
future_plan_redacted□ 향후계획
attachment_count0
source_detail_sha2562f093eb679886d50a259db2393f6c754b00837ca2dfdf5a36aee510a6ff439d0
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|234785|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_1c8bb957fffaf63d

Sources EV-40ce71dd946788069846fcc6
Evidence SHA-256 2f093eb679886d50a259db2393f6c754b00837ca2dfdf5a36aee510a6ff439d0
행 SHA-256 1c82583183781864954e4facee87e378cec209b56d49226d4c6cda379c92f62e
Source snapshots by date · KOR · kepco_planned

154kV 부여#2분기 전력구 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_c5891c5b8829e8f6
stable_project_keyprjtDef:234785:ESB
project_definition234785
first_region_codeESB
manual_source_formatfalse
project_name154kV 부여#2분기 전력구 건설사업
project_name_list154kV 부여#2분기 전력구 건설사업
purpose부여지역 재생E 연계용량 확보
project_region_detail충청남도 부여군
project_period_raw2026.02~2032.10
project_scale_rawXLPE2000 × 4C, L=2.4KM
responsible_office_raw중부건설본부/직할
equipment_type전력구
headquarters중부건설본부
office직할
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_1c8bb957fffaf63d
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_c5891c5b8829e8f6

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_c5891c5b8829e8f6

Sources EV-0fc7006568f234c5105ca76f
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 c642b7220eebb80848721aac406fb1dad2eb93e2979091a006407087d4c667ed

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel