POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 36items · current page 1–36 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-3bec74f46456e8f3ae958690
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_c2af6123e3a66f60
stable_project_keyprjtDef:232557:ESB
project_definition232557
first_region_codeESB
manual_source_formatfalse
project_name154kV 득량(보성#2)분기T/L 건설사업
project_name_list154kV 득량(보성#2)분기 송전선로 건설사업
purpose보성지역 분산형전원 접속능력 확보
project_region_detail전남광주통합특별시 보성군
project_period_raw2018.06~2026.12
project_scale_rawACSR 410㎟×4C×2B×6.37KM, 철탑 22기
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type가공송전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_5bd6947570a52bc3
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_c2af6123e3a66f60

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_c2af6123e3a66f60

Sources EV-3bec74f46456e8f3ae958690
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 dd128d9a99f872630d9ca5ba17d87056fa363ee3bd66fdcb452fbcf543053313
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2021-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeplan_change
date2025-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-01
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2019-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-06
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-02
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2018-07
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeimplementation_plan_approval
date2026-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeplan_change
date2022-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2021-10
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-04
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-03
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-12
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-01
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2019-05
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2018-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2018-06
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source schedule candidates · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-05
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|232557|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source snapshots by date · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_5bd6947570a52bc3
stable_project_idkproj_c2af6123e3a66f60
source_key202609|232557|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 득량(보성#2)분기 송전선로 건설사업
project_name_detail154kV 득량(보성#2)분기T/L 건설사업
region_summary_raw전남광주통합특별시 보성군등 1 지역
equipment_type_raw가공송전
headquarters_raw중부건설본부
office_raw광주전남건설지사
section_fields
Project purpose
  • 보성지역 분산형전원 접속능력 확보
Project region
  • 전남광주통합특별시 보성군
Project period
  • 2018.06~2026.12
사업 규모
  • ACSR 410㎟×4C×2B×6.37KM, 철탑 22기
담당 사업소
  • 중부건설본부/광주전남건설지사
계획확정
  • 제08차 장기송변전설비계획 반영(2018.07)
입지선정
  • 전력입지영향평가 용역 착수: 2019.05 입지선정위원회 구성시기: 2020.12 참여 위원 수 : 14 지장유무 조회: 2021.06~2021.10 경과지(부지) 확정: 2021.05
환경/재해 영향평가
  • 환경영향평가: 2022.02 ~ 재해영향평가: 2022.02 ~
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
  • [입지선정 주요내용] □ '20.12 : 입지선정위원회 구성 및 착수회의 시행(12/23, 보성녹차리조트) - 내용 : 위원장 선출 및 운영규범(안) 확정 □ '21.01 : 입지선정위원회 2차(서면)회의 시행 관련 위원 개별 의견청취 □ '21.02 : 입지선정위원회 2차(서면)회의 시행(2/8 ∼ 2/10) - 내용 : 위원별 개별 선호도조사 시행 □ '21.03 : 입지선정위원회 3차회의 시행(3/17, 보성녹차리조트) - 내용 : 운영규범 수정 및 최적경과대역 결정 □ '21.04 : 입지선정위원회 4차회의 시행(4/23, 보성녹차리조트) - 내용 : 후보경과지(안) 관련 논의 □'21.05 : 입지선정위원회 5차회의 시행(5/13, 보성녹차리조트) - 내용 : 최적 경과지 선정 □ '22.11 : 최적 경과지 대상, 일부구간 계획변경 지중화 관련 지자체 및 주민협의 □ '23.01 ~ 04 : 입지선정위원회 소위원회 구성(위원 8人) 및 착수회의(4/25) □ '25.03 ~ 04 : 입지선정위원회 소위원회 회의 개최 - 내용 : 케이블타워 인출입 입지 등 협의 □ '25.07 : 입지선정위원회 6차회의 시행(7/11, 득량면문화복지센터) - 내용 : 변경 최적경과지 선정
[추진실적] □ '18.07 : 제 8차 장기 송·변전설비계획 반영 □ '19.05 : 전력영향평가 및 경과지설계 용역 착수 □ '21.05 : 송전선로 최적 경과지 선정 □ '21.06 ~ 10 : 지자체 및 관계기관 지장유무조회 □ '22.04 ~ '25.04 : 최적 경과지 대상, 일부구간 계획 변경 지중화 관련 지자체, 주민대표 협의, 입지선정위 소위원회(1∼3차) 개최 및 지중화 구간 협의 □ '25.07 : 최적 경과지 선정 완료 □ '25.08 ~ '26.05 : 최적 경과지 대상 설계·측량 [향후계획] □ '26.10 : 사업시행계획 열람·공고 □ '26.10 : 보성군 주민설명회 시행 □ '26.12 : 전원개발사업 실시계획 승인신청
future_plan_redacted□ 향후계획 [추진실적] □ '18.07 : 제 8차 장기 송·변전설비계획 반영 □ '19.05 : 전력영향평가 및 경과지설계 용역 착수 □ '21.05 : 송전선로 최적 경과지 선정 □ '21.06 ~ 10 : 지자체 및 관계기관 지장유무조회 □ '22.04 ~ '25.04 : 최적 경과지 대상, 일부구간 계획 변경 지중화 관련 지자체, 주민대표 협의, 입지선정위 소위원회(1∼3차) 개최 및 지중화 구간 협의 □ '25.07 : 최적 경과지 선정 완료 □ '25.08 ~ '26.05 : 최적 경과지 대상 설계·측량 [향후계획] □ '26.10 : 사업시행계획 열람·공고 □ '26.10 : 보성군 주민설명회 시행 □ '26.12 : 전원개발사업 실시계획 승인신청
attachment_count0
source_detail_sha256d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|232557|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_5bd6947570a52bc3

Sources EV-256f680f227caef385c2de13
Evidence SHA-256 d4417e09c6c5856f15971fb858d26fa742b94c9f286c81ac5b7b86c6606e12bf
행 SHA-256 8b489da4b858b96ab92f45bb96e5bf6fbf7ca2f707f74812c5babb9fdc9cb98c
Source snapshots by date · KOR · kepco_planned

154kV 득량(보성#2)분기T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_c2af6123e3a66f60
stable_project_keyprjtDef:232557:ESB
project_definition232557
first_region_codeESB
manual_source_formatfalse
project_name154kV 득량(보성#2)분기T/L 건설사업
project_name_list154kV 득량(보성#2)분기 송전선로 건설사업
purpose보성지역 분산형전원 접속능력 확보
project_region_detail전남광주통합특별시 보성군
project_period_raw2018.06~2026.12
project_scale_rawACSR 410㎟×4C×2B×6.37KM, 철탑 22기
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type가공송전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_5bd6947570a52bc3
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_c2af6123e3a66f60

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_c2af6123e3a66f60

Sources EV-3bec74f46456e8f3ae958690
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 dd128d9a99f872630d9ca5ba17d87056fa363ee3bd66fdcb452fbcf543053313

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel