POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 10items · current page 1–10 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-6c55ca49402ae6116ddf7ce1
Detailed source fields Original source field Published value or condition stable_project_id kproj_bd8ae6b831641706 stable_project_key prjtDef:231192:ESB project_definition 231192 first_region_code ESB manual_source_format false project_name 154kV 동송S/S 건설사업 project_name_list 154kV 동송변전소 건설사업 purpose 철원지역 신규공급 능력 확보 및 철원S/S 중부하 해소 project_region_detail 강원특별자치도 철원군 project_period_raw 2013.01~2029.12 project_scale_raw 154KV M.TR 60MVA× 2BANK responsible_office_raw 경인건설본부/직할 equipment_type 변전 headquarters 경인건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_bd8ae6b831641706
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_bd8ae6b831641706
Sources EV-6c55ca49402ae6116ddf7ce1 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 e40f18ac9ebe6b2167d8e2657c028fa60bd5da5d1975dd896ab534789a2e6168 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2029-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231192|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_531d8dc0eddee27e
Sources EV-43e7cef116816d5549caca0b Evidence SHA-256 e7a6768777f54febf64098d38cb32d327fbe6440f74d44d2183b8b699c2992d4 행 SHA-256 d93b02c11baf8fb8780d768308b4bbe02e98ff08f57e85e5a231fcd00b97107b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2005-03 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231192|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_531d8dc0eddee27e
Sources EV-43e7cef116816d5549caca0b Evidence SHA-256 e7a6768777f54febf64098d38cb32d327fbe6440f74d44d2183b8b699c2992d4 행 SHA-256 d93b02c11baf8fb8780d768308b4bbe02e98ff08f57e85e5a231fcd00b97107b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2013-01 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231192|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_531d8dc0eddee27e
Sources EV-43e7cef116816d5549caca0b Evidence SHA-256 e7a6768777f54febf64098d38cb32d327fbe6440f74d44d2183b8b699c2992d4 행 SHA-256 d93b02c11baf8fb8780d768308b4bbe02e98ff08f57e85e5a231fcd00b97107b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2030-01 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231192|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_531d8dc0eddee27e
Sources EV-43e7cef116816d5549caca0b Evidence SHA-256 e7a6768777f54febf64098d38cb32d327fbe6440f74d44d2183b8b699c2992d4 행 SHA-256 d93b02c11baf8fb8780d768308b4bbe02e98ff08f57e85e5a231fcd00b97107b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231192|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_531d8dc0eddee27e
Sources EV-43e7cef116816d5549caca0b Evidence SHA-256 e7a6768777f54febf64098d38cb32d327fbe6440f74d44d2183b8b699c2992d4 행 SHA-256 d93b02c11baf8fb8780d768308b4bbe02e98ff08f57e85e5a231fcd00b97107b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2005-03 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231192|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_531d8dc0eddee27e
Sources EV-43e7cef116816d5549caca0b Evidence SHA-256 e7a6768777f54febf64098d38cb32d327fbe6440f74d44d2183b8b699c2992d4 행 SHA-256 d93b02c11baf8fb8780d768308b4bbe02e98ff08f57e85e5a231fcd00b97107b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2031-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231192|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_531d8dc0eddee27e
Sources EV-43e7cef116816d5549caca0b Evidence SHA-256 e7a6768777f54febf64098d38cb32d327fbe6440f74d44d2183b8b699c2992d4 행 SHA-256 d93b02c11baf8fb8780d768308b4bbe02e98ff08f57e85e5a231fcd00b97107b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_531d8dc0eddee27e stable_project_id kproj_bd8ae6b831641706 source_key 202609|231192|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 동송변전소 건설사업 project_name_detail 154kV 동송S/S 건설사업 region_summary_raw 강원특별자치도 철원군등 1 지역 equipment_type_raw 변전 headquarters_raw 경인건설본부 office_raw 직할 section_fields Project purpose 철원지역 신규공급 능력 확보 및 철원S/S 중부하 해소 계획확정 제02차 장기송변전설비계획 반영(2005.03) 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: □ '05.03 : 제2차 장기송변전설비계획 수립 □ '26.09 : 입지선정 중 □ '30.01 : 토건공사 착공 예정 □ '31.12 : 변전소 최초가압 예정 (※ 상기 일정은 계통 여건에 따라 변동될 수 있음) future_plan_redacted □ 향후계획 □ '05.03 : 제2차 장기송변전설비계획 수립 □ '26.09 : 입지선정 중 □ '30.01 : 토건공사 착공 예정 □ '31.12 : 변전소 최초가압 예정 (※ 상기 일정은 계통 여건에 따라 변동될 수 있음) attachment_count 0 source_detail_sha256 e7a6768777f54febf64098d38cb32d327fbe6440f74d44d2183b8b699c2992d4 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231192|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_531d8dc0eddee27e
Sources EV-43e7cef116816d5549caca0b Evidence SHA-256 e7a6768777f54febf64098d38cb32d327fbe6440f74d44d2183b8b699c2992d4 행 SHA-256 d93b02c11baf8fb8780d768308b4bbe02e98ff08f57e85e5a231fcd00b97107b Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_bd8ae6b831641706 stable_project_key prjtDef:231192:ESB project_definition 231192 first_region_code ESB manual_source_format false project_name 154kV 동송S/S 건설사업 project_name_list 154kV 동송변전소 건설사업 purpose 철원지역 신규공급 능력 확보 및 철원S/S 중부하 해소 project_region_detail 강원특별자치도 철원군 project_period_raw 2013.01~2029.12 project_scale_raw 154KV M.TR 60MVA× 2BANK responsible_office_raw 경인건설본부/직할 equipment_type 변전 headquarters 경인건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_bd8ae6b831641706
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_bd8ae6b831641706
Sources EV-6c55ca49402ae6116ddf7ce1 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 e40f18ac9ebe6b2167d8e2657c028fa60bd5da5d1975dd896ab534789a2e6168 Observations for this power asset History for this project