Power assets and projects · KOR · kepco_planned

154kV 북신안S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-ec5eec53a6a7cbe156093f0a
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_9e7ebf1b9330ef0e
stable_project_keyprjtDef:231477:ESB
project_definition231477
first_region_codeESB
manual_source_formatfalse
project_name154kV 북신안S/S 건설사업
project_name_list154kV 북신안S/S 건설사업
purpose전남 서해안지역 재생E 연계
project_region_detail전남광주통합특별시 신안군
project_period_raw2021.01~2026.12
project_scale_raw60MVA X 2BANK[최종 4BANK, SH.R 60MVAR X 2BANK]
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type변전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_c26b983b363d72be
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_9e7ebf1b9330ef0e

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_9e7ebf1b9330ef0e

Sources EV-ec5eec53a6a7cbe156093f0a
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 8967dd6dffcea504478916876f946592c831139711c20c6ccd0be850bd890f95
Source schedule candidates · KOR · kepco_planned

154kV 북신안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2021-01
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231477|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c26b983b363d72be

Sources EV-0bf24448162861a2953eb8fb
Evidence SHA-256 583ff453618008b3c194014ad426a8bd806236b07792be12a5d3c14fe8f3c9fe
행 SHA-256 fe9892ad11ae3856521bcc9c726b865d2f14ed726484fa7110ecd909ea11a900
Source schedule candidates · KOR · kepco_planned

154kV 북신안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231477|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c26b983b363d72be

Sources EV-0bf24448162861a2953eb8fb
Evidence SHA-256 583ff453618008b3c194014ad426a8bd806236b07792be12a5d3c14fe8f3c9fe
행 SHA-256 fe9892ad11ae3856521bcc9c726b865d2f14ed726484fa7110ecd909ea11a900
Source snapshots by date · KOR · kepco_planned

154kV 북신안S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_c26b983b363d72be
stable_project_idkproj_9e7ebf1b9330ef0e
source_key202609|231477|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 북신안S/S 건설사업
project_name_detail154kV 북신안S/S 건설사업
region_summary_raw전남광주통합특별시 신안군등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw광주전남건설지사
section_fields
Project purpose
  • 전남 서해안지역 재생E 연계
Project region
  • 전남광주통합특별시 신안군
Project period
  • 2021.01~2026.12
사업 규모
  • 60MVA X 2BANK[최종 4BANK, SH.R 60MVAR X 2BANK]
담당 사업소
  • 중부건설본부/광주전남건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 2021.07 입지선정위원회 구성시기: 2021.12 참여 위원 수 : 16 지장유무 조회: 2022.03~2022.04 경과지(부지) 확정: 2024.03
환경/재해 영향평가
  • 환경영향평가: 2025.03 ~ 2025.10 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회: 2021.10 ~ 2024.01
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 2025.05 ~ 2025.12 설계담당자: [redacted]
[추진실적] □ '18.07 : 제8차 장기 송변전설비계획 반영 □ '21.07 : 전력영향평가 용역 착수 □ '21.12 : 변전소 입지선정위원회 구성 및 착수 □ '22.05 : 후보지 지장유무 조회 및 회신 □ '23.08 : 입지확정위원회 시행 □ '24.08 : 변전소 기본설계 완료 □ '25.05 : 변전소 실시설계 착수 [향후계획] □‘25.09 : 변전공사 착공 □‘26.12 : 변전소 가압
future_plan_redacted□ 향후계획 [추진실적] □ '18.07 : 제8차 장기 송변전설비계획 반영 □ '21.07 : 전력영향평가 용역 착수 □ '21.12 : 변전소 입지선정위원회 구성 및 착수 □ '22.05 : 후보지 지장유무 조회 및 회신 □ '23.08 : 입지확정위원회 시행 □ '24.08 : 변전소 기본설계 완료 □ '25.05 : 변전소 실시설계 착수 [향후계획] □‘25.09 : 변전공사 착공 □‘26.12 : 변전소 가압
attachment_count0
source_detail_sha256583ff453618008b3c194014ad426a8bd806236b07792be12a5d3c14fe8f3c9fe
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231477|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c26b983b363d72be

Sources EV-0bf24448162861a2953eb8fb
Evidence SHA-256 583ff453618008b3c194014ad426a8bd806236b07792be12a5d3c14fe8f3c9fe
행 SHA-256 fe9892ad11ae3856521bcc9c726b865d2f14ed726484fa7110ecd909ea11a900
Source snapshots by date · KOR · kepco_planned

154kV 북신안S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_9e7ebf1b9330ef0e
stable_project_keyprjtDef:231477:ESB
project_definition231477
first_region_codeESB
manual_source_formatfalse
project_name154kV 북신안S/S 건설사업
project_name_list154kV 북신안S/S 건설사업
purpose전남 서해안지역 재생E 연계
project_region_detail전남광주통합특별시 신안군
project_period_raw2021.01~2026.12
project_scale_raw60MVA X 2BANK[최종 4BANK, SH.R 60MVAR X 2BANK]
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type변전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_c26b983b363d72be
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_9e7ebf1b9330ef0e

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_9e7ebf1b9330ef0e

Sources EV-ec5eec53a6a7cbe156093f0a
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 8967dd6dffcea504478916876f946592c831139711c20c6ccd0be850bd890f95

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel