Power assets and projects · KOR · kepco_planned

154kV 동포항S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-e2097b25c1fdef7abcec2e22
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_9ddcef3ac9c97e85
stable_project_keyprjtDef:231645:ESB
project_definition231645
first_region_codeESB
manual_source_formatfalse
project_name154kV 동포항S/S 건설사업
project_name_list154kV 동포항S/S 건설사업
purpose영일만4산단 개발에 따른 계통보강
project_region_detail경상북도 포항시 남구
project_period_raw2023.04~2028.10
project_scale_raw60MVA X 2BANK(4BANK),154KV GIS 16CCT(1.5CB 방식)
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type변전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_ee67a4ac2c012562
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_9ddcef3ac9c97e85

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_9ddcef3ac9c97e85

Sources EV-e2097b25c1fdef7abcec2e22
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 a593177377a7892bdcb5a70d6c3521e59f456dee85bded6df9701f45da18313f
Source schedule candidates · KOR · kepco_planned

154kV 동포항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-10
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231645|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ee67a4ac2c012562

Sources EV-7b97ad0b5e2788eaf465ddcb
Evidence SHA-256 222b842a7cfdb807ebe17ba769b007b9b48fb5ad6b947b94dbaeed9f14f11967
행 SHA-256 fa12d279a5d56b6345f24d231b3e5bc0888d57441d5f5184c61ab8d1de1f37d1
Source schedule candidates · KOR · kepco_planned

154kV 동포항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2026-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231645|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ee67a4ac2c012562

Sources EV-7b97ad0b5e2788eaf465ddcb
Evidence SHA-256 222b842a7cfdb807ebe17ba769b007b9b48fb5ad6b947b94dbaeed9f14f11967
행 SHA-256 fa12d279a5d56b6345f24d231b3e5bc0888d57441d5f5184c61ab8d1de1f37d1
Source schedule candidates · KOR · kepco_planned

154kV 동포항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2028-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231645|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ee67a4ac2c012562

Sources EV-7b97ad0b5e2788eaf465ddcb
Evidence SHA-256 222b842a7cfdb807ebe17ba769b007b9b48fb5ad6b947b94dbaeed9f14f11967
행 SHA-256 fa12d279a5d56b6345f24d231b3e5bc0888d57441d5f5184c61ab8d1de1f37d1
Source schedule candidates · KOR · kepco_planned

154kV 동포항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231645|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ee67a4ac2c012562

Sources EV-7b97ad0b5e2788eaf465ddcb
Evidence SHA-256 222b842a7cfdb807ebe17ba769b007b9b48fb5ad6b947b94dbaeed9f14f11967
행 SHA-256 fa12d279a5d56b6345f24d231b3e5bc0888d57441d5f5184c61ab8d1de1f37d1
Source schedule candidates · KOR · kepco_planned

154kV 동포항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2027-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231645|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ee67a4ac2c012562

Sources EV-7b97ad0b5e2788eaf465ddcb
Evidence SHA-256 222b842a7cfdb807ebe17ba769b007b9b48fb5ad6b947b94dbaeed9f14f11967
행 SHA-256 fa12d279a5d56b6345f24d231b3e5bc0888d57441d5f5184c61ab8d1de1f37d1
Source schedule candidates · KOR · kepco_planned

154kV 동포항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2024-10
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231645|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ee67a4ac2c012562

Sources EV-7b97ad0b5e2788eaf465ddcb
Evidence SHA-256 222b842a7cfdb807ebe17ba769b007b9b48fb5ad6b947b94dbaeed9f14f11967
행 SHA-256 fa12d279a5d56b6345f24d231b3e5bc0888d57441d5f5184c61ab8d1de1f37d1
Source schedule candidates · KOR · kepco_planned

154kV 동포항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-11
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231645|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ee67a4ac2c012562

Sources EV-7b97ad0b5e2788eaf465ddcb
Evidence SHA-256 222b842a7cfdb807ebe17ba769b007b9b48fb5ad6b947b94dbaeed9f14f11967
행 SHA-256 fa12d279a5d56b6345f24d231b3e5bc0888d57441d5f5184c61ab8d1de1f37d1
Source schedule candidates · KOR · kepco_planned

154kV 동포항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2023-04
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231645|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ee67a4ac2c012562

Sources EV-7b97ad0b5e2788eaf465ddcb
Evidence SHA-256 222b842a7cfdb807ebe17ba769b007b9b48fb5ad6b947b94dbaeed9f14f11967
행 SHA-256 fa12d279a5d56b6345f24d231b3e5bc0888d57441d5f5184c61ab8d1de1f37d1
Source schedule candidates · KOR · kepco_planned

154kV 동포항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231645|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ee67a4ac2c012562

Sources EV-7b97ad0b5e2788eaf465ddcb
Evidence SHA-256 222b842a7cfdb807ebe17ba769b007b9b48fb5ad6b947b94dbaeed9f14f11967
행 SHA-256 fa12d279a5d56b6345f24d231b3e5bc0888d57441d5f5184c61ab8d1de1f37d1
Source snapshots by date · KOR · kepco_planned

154kV 동포항S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_ee67a4ac2c012562
stable_project_idkproj_9ddcef3ac9c97e85
source_key202609|231645|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 동포항S/S 건설사업
project_name_detail154kV 동포항S/S 건설사업
region_summary_raw경상북도 포항시 남구등 1 지역
equipment_type_raw변전
headquarters_raw남부건설본부
office_raw대구경북건설지사
section_fields
Project purpose
  • 영일만4산단 개발에 따른 계통보강
Project region
  • 경상북도 포항시 남구
Project period
  • 2023.04~2028.10
사업 규모
  • 60MVA X 2BANK(4BANK),154KV GIS 16CCT(1.5CB 방식)
담당 사업소
  • 남부건설본부/대구경북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 2024.10
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2024.10 ~ 2024.12 실시설계: 설계담당자: [redacted]
-'25.11 : 용지매수 -'26.10 : 실시설계 -'27.02 : 공사착공 -'28.10 : 변전준공
future_plan_redacted□ 향후계획 -'25.11 : 용지매수 -'26.10 : 실시설계 -'27.02 : 공사착공 -'28.10 : 변전준공
attachment_count0
source_detail_sha256222b842a7cfdb807ebe17ba769b007b9b48fb5ad6b947b94dbaeed9f14f11967
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231645|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_ee67a4ac2c012562

Sources EV-7b97ad0b5e2788eaf465ddcb
Evidence SHA-256 222b842a7cfdb807ebe17ba769b007b9b48fb5ad6b947b94dbaeed9f14f11967
행 SHA-256 fa12d279a5d56b6345f24d231b3e5bc0888d57441d5f5184c61ab8d1de1f37d1
Source snapshots by date · KOR · kepco_planned

154kV 동포항S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_9ddcef3ac9c97e85
stable_project_keyprjtDef:231645:ESB
project_definition231645
first_region_codeESB
manual_source_formatfalse
project_name154kV 동포항S/S 건설사업
project_name_list154kV 동포항S/S 건설사업
purpose영일만4산단 개발에 따른 계통보강
project_region_detail경상북도 포항시 남구
project_period_raw2023.04~2028.10
project_scale_raw60MVA X 2BANK(4BANK),154KV GIS 16CCT(1.5CB 방식)
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type변전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_ee67a4ac2c012562
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_9ddcef3ac9c97e85

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_9ddcef3ac9c97e85

Sources EV-e2097b25c1fdef7abcec2e22
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 a593177377a7892bdcb5a70d6c3521e59f456dee85bded6df9701f45da18313f

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel