POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 23items · current page 1–23 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 서운남S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-d797ef534f2de20b048a3373
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_8c86116c0c8606b5
stable_project_keyprjtDef:231510:ESB
project_definition231510
first_region_codeESB
manual_source_formatfalse
project_name154kV 서운남S/S 건설사업
project_name_list154kV 서운남S/S 건설사업
purpose전남 서해안지역 재생E 연계
project_region_detail전남광주통합특별시 무안군
project_period_raw2021.01~2026.12
project_scale_raw60MVAX2BANK[최종 2BANK, SH.R 60MVAR X 2BANK]
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type변전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_23c1c9d727a938cd
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_8c86116c0c8606b5

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_8c86116c0c8606b5

Sources EV-d797ef534f2de20b048a3373
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 56629acd8bede3a90610a4d353c49c9efd1702044121aa0e651fdb55ac741da2
Source schedule candidates · KOR · kepco_planned

154kV 서운남S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-09
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231510|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_23c1c9d727a938cd

Sources EV-e253b03365ca1ba0e5775474
Evidence SHA-256 4f555547dba222ed90d418dbe48e1b9646cac285972f90dedfb71a9a21f7eda6
행 SHA-256 291857cd427ce6b71136dbae24e85fd0452b9dd46da99338f457fb7a39d95586
Source schedule candidates · KOR · kepco_planned

154kV 서운남S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2022-10
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231510|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_23c1c9d727a938cd

Sources EV-e253b03365ca1ba0e5775474
Evidence SHA-256 4f555547dba222ed90d418dbe48e1b9646cac285972f90dedfb71a9a21f7eda6
행 SHA-256 291857cd427ce6b71136dbae24e85fd0452b9dd46da99338f457fb7a39d95586
Source schedule candidates · KOR · kepco_planned

154kV 서운남S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231510|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_23c1c9d727a938cd

Sources EV-e253b03365ca1ba0e5775474
Evidence SHA-256 4f555547dba222ed90d418dbe48e1b9646cac285972f90dedfb71a9a21f7eda6
행 SHA-256 291857cd427ce6b71136dbae24e85fd0452b9dd46da99338f457fb7a39d95586
Source schedule candidates · KOR · kepco_planned

154kV 서운남S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-02
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231510|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_23c1c9d727a938cd

Sources EV-e253b03365ca1ba0e5775474
Evidence SHA-256 4f555547dba222ed90d418dbe48e1b9646cac285972f90dedfb71a9a21f7eda6
행 SHA-256 291857cd427ce6b71136dbae24e85fd0452b9dd46da99338f457fb7a39d95586
Source schedule candidates · KOR · kepco_planned

154kV 서운남S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231510|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_23c1c9d727a938cd

Sources EV-e253b03365ca1ba0e5775474
Evidence SHA-256 4f555547dba222ed90d418dbe48e1b9646cac285972f90dedfb71a9a21f7eda6
행 SHA-256 291857cd427ce6b71136dbae24e85fd0452b9dd46da99338f457fb7a39d95586
Source schedule candidates · KOR · kepco_planned

154kV 서운남S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231510|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_23c1c9d727a938cd

Sources EV-e253b03365ca1ba0e5775474
Evidence SHA-256 4f555547dba222ed90d418dbe48e1b9646cac285972f90dedfb71a9a21f7eda6
행 SHA-256 291857cd427ce6b71136dbae24e85fd0452b9dd46da99338f457fb7a39d95586
Source schedule candidates · KOR · kepco_planned

154kV 서운남S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2023-07
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231510|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_23c1c9d727a938cd

Sources EV-e253b03365ca1ba0e5775474
Evidence SHA-256 4f555547dba222ed90d418dbe48e1b9646cac285972f90dedfb71a9a21f7eda6
행 SHA-256 291857cd427ce6b71136dbae24e85fd0452b9dd46da99338f457fb7a39d95586
Source schedule candidates · KOR · kepco_planned

154kV 서운남S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231510|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_23c1c9d727a938cd

Sources EV-e253b03365ca1ba0e5775474
Evidence SHA-256 4f555547dba222ed90d418dbe48e1b9646cac285972f90dedfb71a9a21f7eda6
행 SHA-256 291857cd427ce6b71136dbae24e85fd0452b9dd46da99338f457fb7a39d95586
Source schedule candidates · KOR · kepco_planned

154kV 서운남S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-09
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231510|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_23c1c9d727a938cd

Sources EV-e253b03365ca1ba0e5775474
Evidence SHA-256 4f555547dba222ed90d418dbe48e1b9646cac285972f90dedfb71a9a21f7eda6
행 SHA-256 291857cd427ce6b71136dbae24e85fd0452b9dd46da99338f457fb7a39d95586
Source schedule candidates · KOR · kepco_planned

154kV 서운남S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231510|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_23c1c9d727a938cd

Sources EV-e253b03365ca1ba0e5775474
Evidence SHA-256 4f555547dba222ed90d418dbe48e1b9646cac285972f90dedfb71a9a21f7eda6
행 SHA-256 291857cd427ce6b71136dbae24e85fd0452b9dd46da99338f457fb7a39d95586
Source schedule candidates · KOR · kepco_planned

154kV 서운남S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2021-10
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231510|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_23c1c9d727a938cd

Sources EV-e253b03365ca1ba0e5775474
Evidence SHA-256 4f555547dba222ed90d418dbe48e1b9646cac285972f90dedfb71a9a21f7eda6
행 SHA-256 291857cd427ce6b71136dbae24e85fd0452b9dd46da99338f457fb7a39d95586
Source schedule candidates · KOR · kepco_planned

154kV 서운남S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2021-01
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231510|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_23c1c9d727a938cd

Sources EV-e253b03365ca1ba0e5775474
Evidence SHA-256 4f555547dba222ed90d418dbe48e1b9646cac285972f90dedfb71a9a21f7eda6
행 SHA-256 291857cd427ce6b71136dbae24e85fd0452b9dd46da99338f457fb7a39d95586
Source schedule candidates · KOR · kepco_planned

154kV 서운남S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231510|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_23c1c9d727a938cd

Sources EV-e253b03365ca1ba0e5775474
Evidence SHA-256 4f555547dba222ed90d418dbe48e1b9646cac285972f90dedfb71a9a21f7eda6
행 SHA-256 291857cd427ce6b71136dbae24e85fd0452b9dd46da99338f457fb7a39d95586
Source schedule candidates · KOR · kepco_planned

154kV 서운남S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2025-08
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231510|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_23c1c9d727a938cd

Sources EV-e253b03365ca1ba0e5775474
Evidence SHA-256 4f555547dba222ed90d418dbe48e1b9646cac285972f90dedfb71a9a21f7eda6
행 SHA-256 291857cd427ce6b71136dbae24e85fd0452b9dd46da99338f457fb7a39d95586
Source schedule candidates · KOR · kepco_planned

154kV 서운남S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-03
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231510|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_23c1c9d727a938cd

Sources EV-e253b03365ca1ba0e5775474
Evidence SHA-256 4f555547dba222ed90d418dbe48e1b9646cac285972f90dedfb71a9a21f7eda6
행 SHA-256 291857cd427ce6b71136dbae24e85fd0452b9dd46da99338f457fb7a39d95586
Source schedule candidates · KOR · kepco_planned

154kV 서운남S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2026-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231510|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_23c1c9d727a938cd

Sources EV-e253b03365ca1ba0e5775474
Evidence SHA-256 4f555547dba222ed90d418dbe48e1b9646cac285972f90dedfb71a9a21f7eda6
행 SHA-256 291857cd427ce6b71136dbae24e85fd0452b9dd46da99338f457fb7a39d95586
Source schedule candidates · KOR · kepco_planned

154kV 서운남S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2020-12
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231510|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_23c1c9d727a938cd

Sources EV-e253b03365ca1ba0e5775474
Evidence SHA-256 4f555547dba222ed90d418dbe48e1b9646cac285972f90dedfb71a9a21f7eda6
행 SHA-256 291857cd427ce6b71136dbae24e85fd0452b9dd46da99338f457fb7a39d95586
Source schedule candidates · KOR · kepco_planned

154kV 서운남S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-07
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231510|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_23c1c9d727a938cd

Sources EV-e253b03365ca1ba0e5775474
Evidence SHA-256 4f555547dba222ed90d418dbe48e1b9646cac285972f90dedfb71a9a21f7eda6
행 SHA-256 291857cd427ce6b71136dbae24e85fd0452b9dd46da99338f457fb7a39d95586
Source schedule candidates · KOR · kepco_planned

154kV 서운남S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-06
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231510|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_23c1c9d727a938cd

Sources EV-e253b03365ca1ba0e5775474
Evidence SHA-256 4f555547dba222ed90d418dbe48e1b9646cac285972f90dedfb71a9a21f7eda6
행 SHA-256 291857cd427ce6b71136dbae24e85fd0452b9dd46da99338f457fb7a39d95586
Source schedule candidates · KOR · kepco_planned

154kV 서운남S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-05
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231510|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_23c1c9d727a938cd

Sources EV-e253b03365ca1ba0e5775474
Evidence SHA-256 4f555547dba222ed90d418dbe48e1b9646cac285972f90dedfb71a9a21f7eda6
행 SHA-256 291857cd427ce6b71136dbae24e85fd0452b9dd46da99338f457fb7a39d95586
Source snapshots by date · KOR · kepco_planned

154kV 서운남S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_23c1c9d727a938cd
stable_project_idkproj_8c86116c0c8606b5
source_key202609|231510|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 서운남S/S 건설사업
project_name_detail154kV 서운남S/S 건설사업
region_summary_raw전남광주통합특별시 무안군등 1 지역
equipment_type_raw변전
headquarters_raw중부건설본부
office_raw광주전남건설지사
section_fields
Project purpose
  • 전남 서해안지역 재생E 연계
Project region
  • 전남광주통합특별시 무안군
Project period
  • 2021.01~2026.12
사업 규모
  • 60MVAX2BANK[최종 2BANK, SH.R 60MVAR X 2BANK]
담당 사업소
  • 중부건설본부/광주전남건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 2021.10 입지선정위원회 구성시기: 2022.05 참여 위원 수 : 19 지장유무 조회: 2022.09~2022.10 경과지(부지) 확정: 2023.07
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 실시설계: 설계담당자: [redacted]
가. 주요 추진경과 □ '20.12 : 전남 서해안 지역 공용송전망 보강계획 수립 □ '21.10 : 전력영향평가 용역 착수 □ '22.02 : 주민대표 대상 사업설명회 시행 □ '22.09 : 지장유무 조회(무안군청, 농어촌공사, 31사단) □ '22.02~23.03 : 입지선정위원회 1차~6차회의 시행(최적부지 1개소 선정) □ '23.06 : 입지확정위원회 시행 및 최적 후보지 선정 □ '23.07 : 부지 현황 측량 및 기기배치 의뢰(→토건부) □ '23.12 : 송전용전기설비 신규이용계약서 계약체결 □ '24.06 : 변전소 부지매수 진행 □ '25.08 : 송전용전기설비 변경이용계약서 계약체결 □ '25.09 : 송전용전기설비 공사시행계약 체결
future_plan_redacted□ 향후계획 가. 주요 추진경과 □ '20.12 : 전남 서해안 지역 공용송전망 보강계획 수립 □ '21.10 : 전력영향평가 용역 착수 □ '22.02 : 주민대표 대상 사업설명회 시행 □ '22.09 : 지장유무 조회(무안군청, 농어촌공사, 31사단) □ '22.02~23.03 : 입지선정위원회 1차~6차회의 시행(최적부지 1개소 선정) □ '23.06 : 입지확정위원회 시행 및 최적 후보지 선정 □ '23.07 : 부지 현황 측량 및 기기배치 의뢰(→토건부) □ '23.12 : 송전용전기설비 신규이용계약서 계약체결 □ '24.06 : 변전소 부지매수 진행 □ '25.08 : 송전용전기설비 변경이용계약서 계약체결 □ '25.09 : 송전용전기설비 공사시행계약 체결
attachment_count0
source_detail_sha2564f555547dba222ed90d418dbe48e1b9646cac285972f90dedfb71a9a21f7eda6
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231510|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_23c1c9d727a938cd

Sources EV-e253b03365ca1ba0e5775474
Evidence SHA-256 4f555547dba222ed90d418dbe48e1b9646cac285972f90dedfb71a9a21f7eda6
행 SHA-256 291857cd427ce6b71136dbae24e85fd0452b9dd46da99338f457fb7a39d95586
Source snapshots by date · KOR · kepco_planned

154kV 서운남S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_8c86116c0c8606b5
stable_project_keyprjtDef:231510:ESB
project_definition231510
first_region_codeESB
manual_source_formatfalse
project_name154kV 서운남S/S 건설사업
project_name_list154kV 서운남S/S 건설사업
purpose전남 서해안지역 재생E 연계
project_region_detail전남광주통합특별시 무안군
project_period_raw2021.01~2026.12
project_scale_raw60MVAX2BANK[최종 2BANK, SH.R 60MVAR X 2BANK]
responsible_office_raw중부건설본부/광주전남건설지사
equipment_type변전
headquarters중부건설본부
office광주전남건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_23c1c9d727a938cd
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_8c86116c0c8606b5

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_8c86116c0c8606b5

Sources EV-d797ef534f2de20b048a3373
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 56629acd8bede3a90610a4d353c49c9efd1702044121aa0e651fdb55ac741da2

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel