POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 29items · current page 1–29 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-441dc3de4c25a325671d67a1
Detailed source fields Original source field Published value or condition stable_project_id kproj_5a30c781906ab260 stable_project_key prjtDef:232579:ESB project_definition 232579 first_region_code ESB manual_source_format false project_name 154kV 산서분기T/L 건설사업 project_name_list 154kV 산서분기 송전선로 건설사업 purpose 장수지역 신재생발전 접속용량 확보 project_region_detail 전북특별자치도 장수군 project_period_raw project_scale_raw ACSR 410㎟ × S × 4C responsible_office_raw 남부건설본부/직할 equipment_type 가공송전 headquarters 남부건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_5a30c781906ab260
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_5a30c781906ab260
Sources EV-441dc3de4c25a325671d67a1 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 e2606cb1458ee4b812d69f6c5b643a40fc9540e769ad95c9c8738ff56ccee77f Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fc98e56ced8ad26e
Sources EV-90acbd7d539e1b7321c9eca7 Evidence SHA-256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 행 SHA-256 0f29f63c9f39e2267fe0b8677eb6fd8cda3b91bf63c17897931cadd0f07d093c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fc98e56ced8ad26e
Sources EV-90acbd7d539e1b7321c9eca7 Evidence SHA-256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 행 SHA-256 0f29f63c9f39e2267fe0b8677eb6fd8cda3b91bf63c17897931cadd0f07d093c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2028-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fc98e56ced8ad26e
Sources EV-90acbd7d539e1b7321c9eca7 Evidence SHA-256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 행 SHA-256 0f29f63c9f39e2267fe0b8677eb6fd8cda3b91bf63c17897931cadd0f07d093c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2029-04 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fc98e56ced8ad26e
Sources EV-90acbd7d539e1b7321c9eca7 Evidence SHA-256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 행 SHA-256 0f29f63c9f39e2267fe0b8677eb6fd8cda3b91bf63c17897931cadd0f07d093c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-11 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fc98e56ced8ad26e
Sources EV-90acbd7d539e1b7321c9eca7 Evidence SHA-256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 행 SHA-256 0f29f63c9f39e2267fe0b8677eb6fd8cda3b91bf63c17897931cadd0f07d093c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-06 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fc98e56ced8ad26e
Sources EV-90acbd7d539e1b7321c9eca7 Evidence SHA-256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 행 SHA-256 0f29f63c9f39e2267fe0b8677eb6fd8cda3b91bf63c17897931cadd0f07d093c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fc98e56ced8ad26e
Sources EV-90acbd7d539e1b7321c9eca7 Evidence SHA-256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 행 SHA-256 0f29f63c9f39e2267fe0b8677eb6fd8cda3b91bf63c17897931cadd0f07d093c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2026-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fc98e56ced8ad26e
Sources EV-90acbd7d539e1b7321c9eca7 Evidence SHA-256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 행 SHA-256 0f29f63c9f39e2267fe0b8677eb6fd8cda3b91bf63c17897931cadd0f07d093c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fc98e56ced8ad26e
Sources EV-90acbd7d539e1b7321c9eca7 Evidence SHA-256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 행 SHA-256 0f29f63c9f39e2267fe0b8677eb6fd8cda3b91bf63c17897931cadd0f07d093c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fc98e56ced8ad26e
Sources EV-90acbd7d539e1b7321c9eca7 Evidence SHA-256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 행 SHA-256 0f29f63c9f39e2267fe0b8677eb6fd8cda3b91bf63c17897931cadd0f07d093c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fc98e56ced8ad26e
Sources EV-90acbd7d539e1b7321c9eca7 Evidence SHA-256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 행 SHA-256 0f29f63c9f39e2267fe0b8677eb6fd8cda3b91bf63c17897931cadd0f07d093c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fc98e56ced8ad26e
Sources EV-90acbd7d539e1b7321c9eca7 Evidence SHA-256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 행 SHA-256 0f29f63c9f39e2267fe0b8677eb6fd8cda3b91bf63c17897931cadd0f07d093c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fc98e56ced8ad26e
Sources EV-90acbd7d539e1b7321c9eca7 Evidence SHA-256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 행 SHA-256 0f29f63c9f39e2267fe0b8677eb6fd8cda3b91bf63c17897931cadd0f07d093c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fc98e56ced8ad26e
Sources EV-90acbd7d539e1b7321c9eca7 Evidence SHA-256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 행 SHA-256 0f29f63c9f39e2267fe0b8677eb6fd8cda3b91bf63c17897931cadd0f07d093c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2023-08 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fc98e56ced8ad26e
Sources EV-90acbd7d539e1b7321c9eca7 Evidence SHA-256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 행 SHA-256 0f29f63c9f39e2267fe0b8677eb6fd8cda3b91bf63c17897931cadd0f07d093c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2023-08 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fc98e56ced8ad26e
Sources EV-90acbd7d539e1b7321c9eca7 Evidence SHA-256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 행 SHA-256 0f29f63c9f39e2267fe0b8677eb6fd8cda3b91bf63c17897931cadd0f07d093c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fc98e56ced8ad26e
Sources EV-90acbd7d539e1b7321c9eca7 Evidence SHA-256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 행 SHA-256 0f29f63c9f39e2267fe0b8677eb6fd8cda3b91bf63c17897931cadd0f07d093c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2026-01 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fc98e56ced8ad26e
Sources EV-90acbd7d539e1b7321c9eca7 Evidence SHA-256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 행 SHA-256 0f29f63c9f39e2267fe0b8677eb6fd8cda3b91bf63c17897931cadd0f07d093c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fc98e56ced8ad26e
Sources EV-90acbd7d539e1b7321c9eca7 Evidence SHA-256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 행 SHA-256 0f29f63c9f39e2267fe0b8677eb6fd8cda3b91bf63c17897931cadd0f07d093c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-12 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fc98e56ced8ad26e
Sources EV-90acbd7d539e1b7321c9eca7 Evidence SHA-256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 행 SHA-256 0f29f63c9f39e2267fe0b8677eb6fd8cda3b91bf63c17897931cadd0f07d093c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fc98e56ced8ad26e
Sources EV-90acbd7d539e1b7321c9eca7 Evidence SHA-256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 행 SHA-256 0f29f63c9f39e2267fe0b8677eb6fd8cda3b91bf63c17897931cadd0f07d093c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type implementation_plan_approval date 2025-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fc98e56ced8ad26e
Sources EV-90acbd7d539e1b7321c9eca7 Evidence SHA-256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 행 SHA-256 0f29f63c9f39e2267fe0b8677eb6fd8cda3b91bf63c17897931cadd0f07d093c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2026-05 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fc98e56ced8ad26e
Sources EV-90acbd7d539e1b7321c9eca7 Evidence SHA-256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 행 SHA-256 0f29f63c9f39e2267fe0b8677eb6fd8cda3b91bf63c17897931cadd0f07d093c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-04 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fc98e56ced8ad26e
Sources EV-90acbd7d539e1b7321c9eca7 Evidence SHA-256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 행 SHA-256 0f29f63c9f39e2267fe0b8677eb6fd8cda3b91bf63c17897931cadd0f07d093c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2026-09 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fc98e56ced8ad26e
Sources EV-90acbd7d539e1b7321c9eca7 Evidence SHA-256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 행 SHA-256 0f29f63c9f39e2267fe0b8677eb6fd8cda3b91bf63c17897931cadd0f07d093c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type design_completion date 2026-02 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|232579|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fc98e56ced8ad26e
Sources EV-90acbd7d539e1b7321c9eca7 Evidence SHA-256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 행 SHA-256 0f29f63c9f39e2267fe0b8677eb6fd8cda3b91bf63c17897931cadd0f07d093c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_fc98e56ced8ad26e stable_project_id kproj_5a30c781906ab260 source_key 202609|232579|ESB basic_ym 202609 source_stage_raw 공사착수-사업완료전 project_name_list 154kV 산서분기 송전선로 건설사업 project_name_detail 154kV 산서분기T/L 건설사업 region_summary_raw 전북특별자치도 장수군등 1 지역 equipment_type_raw 가공송전 headquarters_raw 남부건설본부 office_raw 직할 section_fields 입지선정 전력입지영향평가 용역 착수: 2022.06 입지선정위원회 구성시기: 2022.11 참여 위원 수 : 20 지장유무 조회: 2023.07~2023.08 경과지(부지) 확정: 2023.08 주민의견 수렴 지자체 공고 열람: 2024.12 ~ 2024.12 설명회·공청회: 자체설명회: 사업설계 설계용역: 2022.06 ~ 2025.12 기본설계: 2025.04 ~ 2025.05 실시설계: 2025.10 ~ 2026.02 설계담당자: [redacted] 건설공사 개요 공사 착공: 2026.05 공사 기간: 2026.05 ~ 2029.04 감독자: [redacted], 실적): 54, 38 [추진실적] □ '21. 7 : 제9차 장기송변전설비계획 반영 □ '22. 6 : 주민주도형 전력영향평가용역 착수 □ '22. 7 ~ 8 : 사업설명 시행(장수군청, 군의회, 산서면 이장단 등) □ '22.11 ~ 23. 8 : 입지선정위원회 6회 개최 □ '23. 5 ~ 7 : 후보부지 주변 마을 사업설명회 실시 □ '23. 7 ~ 8 : 지장유무 조회 □ '23. 8 : 송전선로 최적 경과지 선정 □ '23.12 : 경과지 설계측량 완료 □ '24.12 : 사업시행계획 열람공고 및 주민설명회 시행 □ '25.02 : 전원개발사업 실시계획 승인신청 □ '26.01 : 전원개발사업 실시계획 승인 및 관보고시 □ '26.02 : 실시설계 완료 □ '26.05 : 공사 착공 [향후계획] □ '26.09 : 책임감리용역 착수 □ '28.04 : 송전선로 가압 future_plan_redacted □ 향후계획 [추진실적] □ '21. 7 : 제9차 장기송변전설비계획 반영 □ '22. 6 : 주민주도형 전력영향평가용역 착수 □ '22. 7 ~ 8 : 사업설명 시행(장수군청, 군의회, 산서면 이장단 등) □ '22.11 ~ 23. 8 : 입지선정위원회 6회 개최 □ '23. 5 ~ 7 : 후보부지 주변 마을 사업설명회 실시 □ '23. 7 ~ 8 : 지장유무 조회 □ '23. 8 : 송전선로 최적 경과지 선정 □ '23.12 : 경과지 설계측량 완료 □ '24.12 : 사업시행계획 열람공고 및 주민설명회 시행 □ '25.02 : 전원개발사업 실시계획 승인신청 □ '26.01 : 전원개발사업 실시계획 승인 및 관보고시 □ '26.02 : 실시설계 완료 □ '26.05 : 공사 착공 [향후계획] □ '26.09 : 책임감리용역 착수 □ '28.04 : 송전선로 가압 attachment_count 0 source_detail_sha256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232579|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_fc98e56ced8ad26e
Sources EV-90acbd7d539e1b7321c9eca7 Evidence SHA-256 e292b8dbae6143680c5f9e8c16187786bc0f2b9c3ca0edd923be3c774fb17f81 행 SHA-256 0f29f63c9f39e2267fe0b8677eb6fd8cda3b91bf63c17897931cadd0f07d093c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_5a30c781906ab260 stable_project_key prjtDef:232579:ESB project_definition 232579 first_region_code ESB manual_source_format false project_name 154kV 산서분기T/L 건설사업 project_name_list 154kV 산서분기 송전선로 건설사업 purpose 장수지역 신재생발전 접속용량 확보 project_region_detail 전북특별자치도 장수군 project_period_raw project_scale_raw ACSR 410㎟ × S × 4C responsible_office_raw 남부건설본부/직할 equipment_type 가공송전 headquarters 남부건설본부 office 직할 current_stage_raw 공사착수-사업완료전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 공사착수-사업완료전 source_record_id stable_project_id:kproj_5a30c781906ab260
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_5a30c781906ab260
Sources EV-441dc3de4c25a325671d67a1 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 e2606cb1458ee4b812d69f6c5b643a40fc9540e769ad95c9c8738ff56ccee77f Observations for this power asset History for this project