Power assets and projects · KOR · kepco_planned

154kV 동포항S/S 연계 지중T/L 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-0d7cee4eb27d8c22b7fe4243
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_4726ec2fee0fc2b8
stable_project_keyprjtDef:233712:ESB
project_definition233712
first_region_codeESB
manual_source_formatfalse
project_name154kV 동포항S/S 연계 지중T/L 건설사업
project_name_list154kV 동포항S/S 연계 지중 송전선로 건설사업
purpose포항 영일만 4일반산단 부하공급 및 흥해S/S 부하분담
project_region_detail경상북도 포항시 북구
project_period_raw2026.10~2029.01
project_scale_raw154㎸ XLPE 2,000㎟ 2C(D)×(1.8㎞+2.7㎞)
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type지중송전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_c5ba131d930b3bff
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_4726ec2fee0fc2b8

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_4726ec2fee0fc2b8

Sources EV-0d7cee4eb27d8c22b7fe4243
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 258b0d4390e5d7236532d5fd0c7f811adae4e7d94c5ebfa1d654eee694708d7b
Source schedule candidates · KOR · kepco_planned

154kV 동포항S/S 연계 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2029-01
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233712|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c5ba131d930b3bff

Sources EV-252336fa369bb2e24ea70f6f
Evidence SHA-256 55c2aff8a484b4f71e380bcf1be886577042b2c66dcedcd799cb80a13081b024
행 SHA-256 071018fdc13e6d864907d8d1c8706769f4e07f7d8dd53c50e6f13d3e74eb4097
Source schedule candidates · KOR · kepco_planned

154kV 동포항S/S 연계 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2026-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|233712|ESB
migration_statusrevision2_new_snapshot_period_only

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c5ba131d930b3bff

Sources EV-252336fa369bb2e24ea70f6f
Evidence SHA-256 55c2aff8a484b4f71e380bcf1be886577042b2c66dcedcd799cb80a13081b024
행 SHA-256 071018fdc13e6d864907d8d1c8706769f4e07f7d8dd53c50e6f13d3e74eb4097
Source snapshots by date · KOR · kepco_planned

154kV 동포항S/S 연계 지중T/L 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_c5ba131d930b3bff
stable_project_idkproj_4726ec2fee0fc2b8
source_key202609|233712|ESB
basic_ym202609
source_stage_raw사업승인-공사착수전
project_name_list154kV 동포항S/S 연계 지중 송전선로 건설사업
project_name_detail154kV 동포항S/S 연계 지중T/L 건설사업
region_summary_raw경상북도 포항시 북구등 1 지역
equipment_type_raw지중송전
headquarters_raw남부건설본부
office_raw대구경북건설지사
section_fields
Project purpose
  • 포항 영일만 4일반산단 부하공급 및 흥해S/S 부하분담
Project region
  • 경상북도 포항시 북구
Project period
  • 2026.10~2029.01
사업 규모
  • 154㎸ XLPE 2,000㎟ 2C(D)×(1.8㎞+2.7㎞)
담당 사업소
  • 남부건설본부/대구경북건설지사
계획확정
  • 제10차 장기송변전설비계획 반영(2023.05)
입지선정
  • 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
전원개발사업 실시계획 승인
사업설계
  • 설계용역: 기본설계: 2026.05 ~ 2026.12 실시설계: 2027.02 ~ 2027.06 설계담당자: [redacted]
o '21.12 : 지중화 심의 o '23.05 : 제10차 장기송변전설비계획반영(‘28.10) o '23.05 : 산업단지 내 변전소 위치 반영 o '24.03 : 송전선로(가공) 실시계획 승인신청 o '26.08 : 송전선로(지중) 기본설계
future_plan_redacted□ 향후계획 o '21.12 : 지중화 심의 o '23.05 : 제10차 장기송변전설비계획반영(‘28.10) o '23.05 : 산업단지 내 변전소 위치 반영 o '24.03 : 송전선로(가공) 실시계획 승인신청 o '26.08 : 송전선로(지중) 기본설계
attachment_count0
source_detail_sha25655c2aff8a484b4f71e380bcf1be886577042b2c66dcedcd799cb80a13081b024
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|233712|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_c5ba131d930b3bff

Sources EV-252336fa369bb2e24ea70f6f
Evidence SHA-256 55c2aff8a484b4f71e380bcf1be886577042b2c66dcedcd799cb80a13081b024
행 SHA-256 071018fdc13e6d864907d8d1c8706769f4e07f7d8dd53c50e6f13d3e74eb4097
Source snapshots by date · KOR · kepco_planned

154kV 동포항S/S 연계 지중T/L 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_4726ec2fee0fc2b8
stable_project_keyprjtDef:233712:ESB
project_definition233712
first_region_codeESB
manual_source_formatfalse
project_name154kV 동포항S/S 연계 지중T/L 건설사업
project_name_list154kV 동포항S/S 연계 지중 송전선로 건설사업
purpose포항 영일만 4일반산단 부하공급 및 흥해S/S 부하분담
project_region_detail경상북도 포항시 북구
project_period_raw2026.10~2029.01
project_scale_raw154㎸ XLPE 2,000㎟ 2C(D)×(1.8㎞+2.7㎞)
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type지중송전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw사업승인-공사착수전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_c5ba131d930b3bff
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text사업승인-공사착수전
source_record_idstable_project_id:kproj_4726ec2fee0fc2b8

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_4726ec2fee0fc2b8

Sources EV-0d7cee4eb27d8c22b7fe4243
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 258b0d4390e5d7236532d5fd0c7f811adae4e7d94c5ebfa1d654eee694708d7b

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel