POWER & FACILITY EVIDENCE

Power and Facility Evidence Database

Review power assets, contract observations, facility specifications and relationships from public sources.

This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.

Current filters 15items · current page 1–15 · Source records, not unique facilities.

Power assets and projects · KOR · kepco_planned

154kV 산서S/S 건설사업

Power project · Construction project

Metric or conditionSource valueBasis, scope and stage
project_name_voltage_label154 kVliteral project name label not service voltage · project name · Construction project
As-of date 2026-09
Sources EV-5177ca3ca15334a07993d937
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_46056454b23f4275
stable_project_keyprjtDef:231555:ESB
project_definition231555
first_region_codeESB
manual_source_formatfalse
project_name154kV 산서S/S 건설사업
project_name_list154kV 산서 변전소 건설사업
purpose신재생 연계
project_region_detail전북특별자치도 장수군
project_period_raw2021.10~2028.12
project_scale_raw154KV M.TR 60MVA × 2BANK
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type변전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_d1964a7caec4f60c
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_46056454b23f4275

Location: Coordinates not obtained · no map marker

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_46056454b23f4275

Sources EV-5177ca3ca15334a07993d937
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 023fa815509f93704ab853bc7f94bb06b641c9ed41ca428f551e951d1d1d17fe
Source schedule candidates · KOR · kepco_planned

154kV 산서S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231555|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d1964a7caec4f60c

Sources EV-a24b19729b29cf5f6e0b5011
Evidence SHA-256 8506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689
행 SHA-256 b6dd466a7a87ba9b68d85772aa6f7db22fdafcd8a5b209c936a801f8c02972ff
Source schedule candidates · KOR · kepco_planned

154kV 산서S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2023-07
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231555|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d1964a7caec4f60c

Sources EV-a24b19729b29cf5f6e0b5011
Evidence SHA-256 8506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689
행 SHA-256 b6dd466a7a87ba9b68d85772aa6f7db22fdafcd8a5b209c936a801f8c02972ff
Source schedule candidates · KOR · kepco_planned

154kV 산서S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeroute_or_site_confirmation
date2023-09
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231555|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d1964a7caec4f60c

Sources EV-a24b19729b29cf5f6e0b5011
Evidence SHA-256 8506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689
행 SHA-256 b6dd466a7a87ba9b68d85772aa6f7db22fdafcd8a5b209c936a801f8c02972ff
Source schedule candidates · KOR · kepco_planned

154kV 산서S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_completion
date2028-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231555|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d1964a7caec4f60c

Sources EV-a24b19729b29cf5f6e0b5011
Evidence SHA-256 8506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689
행 SHA-256 b6dd466a7a87ba9b68d85772aa6f7db22fdafcd8a5b209c936a801f8c02972ff
Source schedule candidates · KOR · kepco_planned

154kV 산서S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeconstruction_start
date2026-10
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231555|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d1964a7caec4f60c

Sources EV-a24b19729b29cf5f6e0b5011
Evidence SHA-256 8506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689
행 SHA-256 b6dd466a7a87ba9b68d85772aa6f7db22fdafcd8a5b209c936a801f8c02972ff
Source schedule candidates · KOR · kepco_planned

154kV 산서S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-11
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231555|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d1964a7caec4f60c

Sources EV-a24b19729b29cf5f6e0b5011
Evidence SHA-256 8506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689
행 SHA-256 b6dd466a7a87ba9b68d85772aa6f7db22fdafcd8a5b209c936a801f8c02972ff
Source schedule candidates · KOR · kepco_planned

154kV 산서S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_end
date2028-12
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231555|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d1964a7caec4f60c

Sources EV-a24b19729b29cf5f6e0b5011
Evidence SHA-256 8506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689
행 SHA-256 b6dd466a7a87ba9b68d85772aa6f7db22fdafcd8a5b209c936a801f8c02972ff
Source schedule candidates · KOR · kepco_planned

154kV 산서S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231555|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d1964a7caec4f60c

Sources EV-a24b19729b29cf5f6e0b5011
Evidence SHA-256 8506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689
행 SHA-256 b6dd466a7a87ba9b68d85772aa6f7db22fdafcd8a5b209c936a801f8c02972ff
Source schedule candidates · KOR · kepco_planned

154kV 산서S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2024-12
date_precisionmonth
assertionsource_mentioned_unverified
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231555|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d1964a7caec4f60c

Sources EV-a24b19729b29cf5f6e0b5011
Evidence SHA-256 8506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689
행 SHA-256 b6dd466a7a87ba9b68d85772aa6f7db22fdafcd8a5b209c936a801f8c02972ff
Source schedule candidates · KOR · kepco_planned

154kV 산서S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typesource_mentioned_date
date2022-07
date_precisionmonth
assertionsource_stated_candidate
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231555|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d1964a7caec4f60c

Sources EV-a24b19729b29cf5f6e0b5011
Evidence SHA-256 8506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689
행 SHA-256 b6dd466a7a87ba9b68d85772aa6f7db22fdafcd8a5b209c936a801f8c02972ff
Source schedule candidates · KOR · kepco_planned

154kV 산서S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeproject_period_start
date2021-10
date_precisionmonth
assertionsource_project_period
verification_statussource_field
operational_prooffalse
source_key202609|231555|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d1964a7caec4f60c

Sources EV-a24b19729b29cf5f6e0b5011
Evidence SHA-256 8506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689
행 SHA-256 b6dd466a7a87ba9b68d85772aa6f7db22fdafcd8a5b209c936a801f8c02972ff
Source schedule candidates · KOR · kepco_planned

154kV 산서S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
event_typeenergization
date2028-04
date_precisionmonth
assertionplanned
verification_statussource_text_candidate
operational_prooffalse
source_key202609|231555|ESB
migration_statusreused_from_validated_revision1_schedule

No separate metric summary is available. Consult the detailed source fields.

Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d1964a7caec4f60c

Sources EV-a24b19729b29cf5f6e0b5011
Evidence SHA-256 8506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689
행 SHA-256 b6dd466a7a87ba9b68d85772aa6f7db22fdafcd8a5b209c936a801f8c02972ff
Source snapshots by date · KOR · kepco_planned

154kV 산서S/S 건설사업

Project · historical source snapshot

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
snapshot_idksnap_d1964a7caec4f60c
stable_project_idkproj_46056454b23f4275
source_key202609|231555|ESB
basic_ym202609
source_stage_raw계획확정-사업승인전
project_name_list154kV 산서 변전소 건설사업
project_name_detail154kV 산서S/S 건설사업
region_summary_raw전북특별자치도 장수군등 1 지역
equipment_type_raw변전
headquarters_raw남부건설본부
office_raw대구경북건설지사
section_fields
Project purpose
  • 신재생 연계
Project region
  • 전북특별자치도 장수군
Project period
  • 2021.10~2028.12
사업 규모
  • 154KV M.TR 60MVA × 2BANK
담당 사업소
  • 남부건설본부/대구경북건설지사
계획확정
입지선정
  • 전력입지영향평가 용역 착수: 2022.07 입지선정위원회 구성시기: 2022.11 참여 위원 수 : 19 지장유무 조회: 2023.07~2023.09 경과지(부지) 확정:
환경/재해 영향평가
  • 환경영향평가: 재해영향평가:
주민의견 수렴
  • 지자체 공고 열람: 2024.12 ~ 2024.12 설명회·공청회: 자체설명회:
입지선정 및 주민의견 수렴 주요 내용
ㅁ'26.10 : 공사 착공 ㅁ'28.04 : 준공 및 가압
future_plan_redacted□ 향후계획 ㅁ'26.10 : 공사 착공 ㅁ'28.04 : 준공 및 가압
attachment_count0
source_detail_sha2568506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
Original reference period202609
source_record_id202609|231555|ESB

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location snapshot_id:ksnap_d1964a7caec4f60c

Sources EV-a24b19729b29cf5f6e0b5011
Evidence SHA-256 8506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689
행 SHA-256 b6dd466a7a87ba9b68d85772aa6f7db22fdafcd8a5b209c936a801f8c02972ff
Source snapshots by date · KOR · kepco_planned

154kV 산서S/S 건설사업

Project · Construction project

Metric or conditionSource valueBasis, scope and stage
Detailed source fields
Original source fieldPublished value or condition
stable_project_idkproj_46056454b23f4275
stable_project_keyprjtDef:231555:ESB
project_definition231555
first_region_codeESB
manual_source_formatfalse
project_name154kV 산서S/S 건설사업
project_name_list154kV 산서 변전소 건설사업
purpose신재생 연계
project_region_detail전북특별자치도 장수군
project_period_raw2021.10~2028.12
project_scale_raw154KV M.TR 60MVA × 2BANK
responsible_office_raw남부건설본부/대구경북건설지사
equipment_type변전
headquarters남부건설본부
office대구경북건설지사
current_stage_raw계획확정-사업승인전
snapshot_count1
active_snapshot_count1
snapshot_ids
  • ksnap_d1964a7caec4f60c
first_seen_at2026-10-02
last_confirmed_at2026-10-02T01:55:13Z
location_precisionregion_only
geometry_semanticsno_verified_geometry
geometryNot obtained
source_list_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do
source_detail_urlhttps://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do
Original text계획확정-사업승인전
source_record_idstable_project_id:kproj_46056454b23f4275

No separate metric summary is available. Consult the detailed source fields.

Sources, reference dates and retrieval dates 1items
kepco_planned ↗

Data Source 2026-09 · Retrieved 2026-10-02

한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분

Source location stable_project_id:kproj_46056454b23f4275

Sources EV-5177ca3ca15334a07993d937
Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba
행 SHA-256 023fa815509f93704ab853bc7f94bb06b641c9ed41ca428f551e951d1d1d17fe

AI-DC KOREA MEMBER

Log In

Sign in to continue on this page.

G Continue with GoogleK Continue with Kakao

Choose the Google or Kakao account you registered with.

Start a consultation · Choose a channel