POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 15items · current page 1–15 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-5177ca3ca15334a07993d937
Detailed source fields Original source field Published value or condition stable_project_id kproj_46056454b23f4275 stable_project_key prjtDef:231555:ESB project_definition 231555 first_region_code ESB manual_source_format false project_name 154kV 산서S/S 건설사업 project_name_list 154kV 산서 변전소 건설사업 purpose 신재생 연계 project_region_detail 전북특별자치도 장수군 project_period_raw 2021.10~2028.12 project_scale_raw 154KV M.TR 60MVA × 2BANK responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 변전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_46056454b23f4275
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_46056454b23f4275
Sources EV-5177ca3ca15334a07993d937 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 023fa815509f93704ab853bc7f94bb06b641c9ed41ca428f551e951d1d1d17fe Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231555|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d1964a7caec4f60c
Sources EV-a24b19729b29cf5f6e0b5011 Evidence SHA-256 8506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689 행 SHA-256 b6dd466a7a87ba9b68d85772aa6f7db22fdafcd8a5b209c936a801f8c02972ff Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231555|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d1964a7caec4f60c
Sources EV-a24b19729b29cf5f6e0b5011 Evidence SHA-256 8506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689 행 SHA-256 b6dd466a7a87ba9b68d85772aa6f7db22fdafcd8a5b209c936a801f8c02972ff Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2023-09 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231555|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d1964a7caec4f60c
Sources EV-a24b19729b29cf5f6e0b5011 Evidence SHA-256 8506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689 행 SHA-256 b6dd466a7a87ba9b68d85772aa6f7db22fdafcd8a5b209c936a801f8c02972ff Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_completion date 2028-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231555|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d1964a7caec4f60c
Sources EV-a24b19729b29cf5f6e0b5011 Evidence SHA-256 8506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689 행 SHA-256 b6dd466a7a87ba9b68d85772aa6f7db22fdafcd8a5b209c936a801f8c02972ff Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2026-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231555|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d1964a7caec4f60c
Sources EV-a24b19729b29cf5f6e0b5011 Evidence SHA-256 8506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689 행 SHA-256 b6dd466a7a87ba9b68d85772aa6f7db22fdafcd8a5b209c936a801f8c02972ff Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231555|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d1964a7caec4f60c
Sources EV-a24b19729b29cf5f6e0b5011 Evidence SHA-256 8506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689 행 SHA-256 b6dd466a7a87ba9b68d85772aa6f7db22fdafcd8a5b209c936a801f8c02972ff Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2028-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231555|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d1964a7caec4f60c
Sources EV-a24b19729b29cf5f6e0b5011 Evidence SHA-256 8506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689 행 SHA-256 b6dd466a7a87ba9b68d85772aa6f7db22fdafcd8a5b209c936a801f8c02972ff Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231555|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d1964a7caec4f60c
Sources EV-a24b19729b29cf5f6e0b5011 Evidence SHA-256 8506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689 행 SHA-256 b6dd466a7a87ba9b68d85772aa6f7db22fdafcd8a5b209c936a801f8c02972ff Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|231555|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d1964a7caec4f60c
Sources EV-a24b19729b29cf5f6e0b5011 Evidence SHA-256 8506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689 행 SHA-256 b6dd466a7a87ba9b68d85772aa6f7db22fdafcd8a5b209c936a801f8c02972ff Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2022-07 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|231555|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d1964a7caec4f60c
Sources EV-a24b19729b29cf5f6e0b5011 Evidence SHA-256 8506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689 행 SHA-256 b6dd466a7a87ba9b68d85772aa6f7db22fdafcd8a5b209c936a801f8c02972ff Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2021-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231555|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d1964a7caec4f60c
Sources EV-a24b19729b29cf5f6e0b5011 Evidence SHA-256 8506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689 행 SHA-256 b6dd466a7a87ba9b68d85772aa6f7db22fdafcd8a5b209c936a801f8c02972ff Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2028-04 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231555|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d1964a7caec4f60c
Sources EV-a24b19729b29cf5f6e0b5011 Evidence SHA-256 8506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689 행 SHA-256 b6dd466a7a87ba9b68d85772aa6f7db22fdafcd8a5b209c936a801f8c02972ff Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_d1964a7caec4f60c stable_project_id kproj_46056454b23f4275 source_key 202609|231555|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 산서 변전소 건설사업 project_name_detail 154kV 산서S/S 건설사업 region_summary_raw 전북특별자치도 장수군등 1 지역 equipment_type_raw 변전 headquarters_raw 남부건설본부 office_raw 대구경북건설지사 section_fields 입지선정 전력입지영향평가 용역 착수: 2022.07 입지선정위원회 구성시기: 2022.11 참여 위원 수 : 19 지장유무 조회: 2023.07~2023.09 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 2024.12 ~ 2024.12 설명회·공청회: 자체설명회: ㅁ'26.10 : 공사 착공 ㅁ'28.04 : 준공 및 가압 future_plan_redacted □ 향후계획 ㅁ'26.10 : 공사 착공 ㅁ'28.04 : 준공 및 가압 attachment_count 0 source_detail_sha256 8506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231555|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d1964a7caec4f60c
Sources EV-a24b19729b29cf5f6e0b5011 Evidence SHA-256 8506d4e7dd63b308b7729c22e7c79bf1d2fd83f65b86df21514e7b6cc0c07689 행 SHA-256 b6dd466a7a87ba9b68d85772aa6f7db22fdafcd8a5b209c936a801f8c02972ff Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_46056454b23f4275 stable_project_key prjtDef:231555:ESB project_definition 231555 first_region_code ESB manual_source_format false project_name 154kV 산서S/S 건설사업 project_name_list 154kV 산서 변전소 건설사업 purpose 신재생 연계 project_region_detail 전북특별자치도 장수군 project_period_raw 2021.10~2028.12 project_scale_raw 154KV M.TR 60MVA × 2BANK responsible_office_raw 남부건설본부/대구경북건설지사 equipment_type 변전 headquarters 남부건설본부 office 대구경북건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_46056454b23f4275
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_46056454b23f4275
Sources EV-5177ca3ca15334a07993d937 Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 023fa815509f93704ab853bc7f94bb06b641c9ed41ca428f551e951d1d1d17fe Observations for this power asset History for this project