Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 5items · current page 1–5 · Source records, not unique facilities.
Power assets and projects · KOR · kepco_planned
154kV 다인S/S 건설사업
Power project · Construction project
Metric or condition
Source value
Basis, scope and stage
project_name_voltage_label
154 kV
literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-a734da30275da36d239b6825
Sources EV-602005059ac6cf20e50cfe8a Evidence SHA-256 4b5263fe3fbc8de5a14798d9362a8cbf3bc8dd20ba9c2fbeecf629a6bc771a4d 행 SHA-256 9502489a3d95c47b9dd40c6b161132a124a21434d74f47973a918b5665980c15Source snapshots by date · KOR · kepco_planned
154kV 다인S/S 건설사업
Project · historical source snapshot
Metric or condition
Source value
Basis, scope and stage
Detailed source fields
Original source field
Published value or condition
snapshot_id
ksnap_4c812ea301a51bdc
stable_project_id
kproj_41de99f55c5eae90
source_key
202609|231552|ESB
basic_ym
202609
source_stage_raw
사업승인-공사착수전
project_name_list
154kV 다인S/S 건설사업
project_name_detail
154kV 다인S/S 건설사업
region_summary_raw
경상북도 의성군등 1 지역
equipment_type_raw
변전
headquarters_raw
남부건설본부
office_raw
대구경북건설지사
section_fields
Project purpose
의성군 다인면 일대 재생E 연계 용량 적기
Project region
경상북도 의성군
Project period
2021.10~2027.12
사업 규모
옥내형 변전소, 154KV M.TR 60MVA×2BANK [최종4BANK]
담당 사업소
남부건설본부/대구경북건설지사
계획확정
입지선정
전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 지장유무 조회: 2022.03~2022.08 경과지(부지) 확정:
Sources EV-602005059ac6cf20e50cfe8a Evidence SHA-256 4b5263fe3fbc8de5a14798d9362a8cbf3bc8dd20ba9c2fbeecf629a6bc771a4d 행 SHA-256 9502489a3d95c47b9dd40c6b161132a124a21434d74f47973a918b5665980c15Source snapshots by date · KOR · kepco_planned