Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 7items · current page 1–7 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-031100e4f3dad4e74b9f102c
Detailed source fields Original source field Published value or condition stable_project_id kproj_227b5dde2e8573d8 stable_project_key prjtDef:231627:ESB project_definition 231627 first_region_code ESB manual_source_format false project_name 154kV 부산항S/S 건설사업 project_name_list 154kV 부산항변전소 건설사업 purpose 부산항 북항재개발 신규부하 공급능력 확보 project_region_detail 부산광역시 동구 project_period_raw 2024.12~2029.12 project_scale_raw M.TR(154/23KV 15/20MVA×1상×3대) × 2BANK responsible_office_raw 남부건설본부/직할 equipment_type 변전 headquarters 남부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_227b5dde2e8573d8
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_227b5dde2e8573d8
Sources EV-031100e4f3dad4e74b9f102c Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 9becd0059041019d59c2e97375d50f019d910aef14de3aae07cc8e2d21eca737 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2024-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231627|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d0644675ae7a9ec2
Sources EV-b446bc491294c3195013ee86 Evidence SHA-256 b2c208a7a5a4fc70e6c1e73040099027ddf6196917ca201789d2572fb2fde232 행 SHA-256 bc7ef1561740027eed2490136a1400d678696795a063cdc029fc0492e321267c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type energization date 2029-10 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231627|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d0644675ae7a9ec2
Sources EV-b446bc491294c3195013ee86 Evidence SHA-256 b2c208a7a5a4fc70e6c1e73040099027ddf6196917ca201789d2572fb2fde232 행 SHA-256 bc7ef1561740027eed2490136a1400d678696795a063cdc029fc0492e321267c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2029-12 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|231627|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d0644675ae7a9ec2
Sources EV-b446bc491294c3195013ee86 Evidence SHA-256 b2c208a7a5a4fc70e6c1e73040099027ddf6196917ca201789d2572fb2fde232 행 SHA-256 bc7ef1561740027eed2490136a1400d678696795a063cdc029fc0492e321267c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type construction_start date 2028-05 date_precision month assertion planned verification_status source_text_candidate operational_proof false source_key 202609|231627|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d0644675ae7a9ec2
Sources EV-b446bc491294c3195013ee86 Evidence SHA-256 b2c208a7a5a4fc70e6c1e73040099027ddf6196917ca201789d2572fb2fde232 행 SHA-256 bc7ef1561740027eed2490136a1400d678696795a063cdc029fc0492e321267c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_d0644675ae7a9ec2 stable_project_id kproj_227b5dde2e8573d8 source_key 202609|231627|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 부산항변전소 건설사업 project_name_detail 154kV 부산항S/S 건설사업 region_summary_raw 부산광역시 동구등 1 지역 equipment_type_raw 변전 headquarters_raw 남부건설본부 office_raw 직할 section_fields 사업 규모 M.TR(154/23KV 15/20MVA×1상×3대) × 2BANK 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: □ ’28.05 : 변전공사 착공 □ ’29.10 : 변전소 최초가압 future_plan_redacted □ 향후계획 □ ’28.05 : 변전공사 착공 □ ’29.10 : 변전소 최초가압 attachment_count 0 source_detail_sha256 b2c208a7a5a4fc70e6c1e73040099027ddf6196917ca201789d2572fb2fde232 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|231627|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_d0644675ae7a9ec2
Sources EV-b446bc491294c3195013ee86 Evidence SHA-256 b2c208a7a5a4fc70e6c1e73040099027ddf6196917ca201789d2572fb2fde232 행 SHA-256 bc7ef1561740027eed2490136a1400d678696795a063cdc029fc0492e321267c Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_227b5dde2e8573d8 stable_project_key prjtDef:231627:ESB project_definition 231627 first_region_code ESB manual_source_format false project_name 154kV 부산항S/S 건설사업 project_name_list 154kV 부산항변전소 건설사업 purpose 부산항 북항재개발 신규부하 공급능력 확보 project_region_detail 부산광역시 동구 project_period_raw 2024.12~2029.12 project_scale_raw M.TR(154/23KV 15/20MVA×1상×3대) × 2BANK responsible_office_raw 남부건설본부/직할 equipment_type 변전 headquarters 남부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_227b5dde2e8573d8
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_227b5dde2e8573d8
Sources EV-031100e4f3dad4e74b9f102c Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 9becd0059041019d59c2e97375d50f019d910aef14de3aae07cc8e2d21eca737 Observations for this power asset History for this project