POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 27items · current page 1–27 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-523485eb06467816e56bcfaf
Detailed source fields Original source field Published value or condition stable_project_id kproj_20573fbc956bd4b8 stable_project_key prjtDef:232674:ESB project_definition 232674 first_region_code ESB manual_source_format false project_name 154kV 금가분기T/L 건설사업 project_name_list 154kV 금가분기 송전선로 건설사업 purpose 충주 금가산단 등 지역개발에 따른 신규공급능력 확보 project_region_detail Chungju City, North Chungcheong Province project_period_raw 2023.06~2027.10 project_scale_raw ACSR410 × 2B × 4C, 6.3KM (철탑14기) responsible_office_raw 중부건설본부/충북강원건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 충북강원건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_20573fbc956bd4b8
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_20573fbc956bd4b8
Sources EV-523485eb06467816e56bcfaf Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 f8f6fdb71bf66088f03f8a798c48a5a8a994661e6c632e1445e476fe361f4601 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232674|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c086b44fb99deea8
Sources EV-66124bdc5fa2507f1704d4e8 Evidence SHA-256 b93844b071d3baa22be58d4558777dccef85c2a2d07ff64a6d1f2407c3931bbf 행 SHA-256 3e27d486a2659b970651acfdf49db2543eeca939d8fbdb738b7dfe2ce12695dd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232674|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c086b44fb99deea8
Sources EV-66124bdc5fa2507f1704d4e8 Evidence SHA-256 b93844b071d3baa22be58d4558777dccef85c2a2d07ff64a6d1f2407c3931bbf 행 SHA-256 3e27d486a2659b970651acfdf49db2543eeca939d8fbdb738b7dfe2ce12695dd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-01 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232674|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c086b44fb99deea8
Sources EV-66124bdc5fa2507f1704d4e8 Evidence SHA-256 b93844b071d3baa22be58d4558777dccef85c2a2d07ff64a6d1f2407c3931bbf 행 SHA-256 3e27d486a2659b970651acfdf49db2543eeca939d8fbdb738b7dfe2ce12695dd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232674|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c086b44fb99deea8
Sources EV-66124bdc5fa2507f1704d4e8 Evidence SHA-256 b93844b071d3baa22be58d4558777dccef85c2a2d07ff64a6d1f2407c3931bbf 행 SHA-256 3e27d486a2659b970651acfdf49db2543eeca939d8fbdb738b7dfe2ce12695dd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232674|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c086b44fb99deea8
Sources EV-66124bdc5fa2507f1704d4e8 Evidence SHA-256 b93844b071d3baa22be58d4558777dccef85c2a2d07ff64a6d1f2407c3931bbf 행 SHA-256 3e27d486a2659b970651acfdf49db2543eeca939d8fbdb738b7dfe2ce12695dd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2023-06 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232674|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c086b44fb99deea8
Sources EV-66124bdc5fa2507f1704d4e8 Evidence SHA-256 b93844b071d3baa22be58d4558777dccef85c2a2d07ff64a6d1f2407c3931bbf 행 SHA-256 3e27d486a2659b970651acfdf49db2543eeca939d8fbdb738b7dfe2ce12695dd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2024-08 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232674|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c086b44fb99deea8
Sources EV-66124bdc5fa2507f1704d4e8 Evidence SHA-256 b93844b071d3baa22be58d4558777dccef85c2a2d07ff64a6d1f2407c3931bbf 행 SHA-256 3e27d486a2659b970651acfdf49db2543eeca939d8fbdb738b7dfe2ce12695dd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-10 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232674|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c086b44fb99deea8
Sources EV-66124bdc5fa2507f1704d4e8 Evidence SHA-256 b93844b071d3baa22be58d4558777dccef85c2a2d07ff64a6d1f2407c3931bbf 행 SHA-256 3e27d486a2659b970651acfdf49db2543eeca939d8fbdb738b7dfe2ce12695dd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-10 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232674|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c086b44fb99deea8
Sources EV-66124bdc5fa2507f1704d4e8 Evidence SHA-256 b93844b071d3baa22be58d4558777dccef85c2a2d07ff64a6d1f2407c3931bbf 행 SHA-256 3e27d486a2659b970651acfdf49db2543eeca939d8fbdb738b7dfe2ce12695dd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2027-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|232674|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c086b44fb99deea8
Sources EV-66124bdc5fa2507f1704d4e8 Evidence SHA-256 b93844b071d3baa22be58d4558777dccef85c2a2d07ff64a6d1f2407c3931bbf 행 SHA-256 3e27d486a2659b970651acfdf49db2543eeca939d8fbdb738b7dfe2ce12695dd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232674|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c086b44fb99deea8
Sources EV-66124bdc5fa2507f1704d4e8 Evidence SHA-256 b93844b071d3baa22be58d4558777dccef85c2a2d07ff64a6d1f2407c3931bbf 행 SHA-256 3e27d486a2659b970651acfdf49db2543eeca939d8fbdb738b7dfe2ce12695dd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232674|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c086b44fb99deea8
Sources EV-66124bdc5fa2507f1704d4e8 Evidence SHA-256 b93844b071d3baa22be58d4558777dccef85c2a2d07ff64a6d1f2407c3931bbf 행 SHA-256 3e27d486a2659b970651acfdf49db2543eeca939d8fbdb738b7dfe2ce12695dd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-06 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232674|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c086b44fb99deea8
Sources EV-66124bdc5fa2507f1704d4e8 Evidence SHA-256 b93844b071d3baa22be58d4558777dccef85c2a2d07ff64a6d1f2407c3931bbf 행 SHA-256 3e27d486a2659b970651acfdf49db2543eeca939d8fbdb738b7dfe2ce12695dd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-07 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232674|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c086b44fb99deea8
Sources EV-66124bdc5fa2507f1704d4e8 Evidence SHA-256 b93844b071d3baa22be58d4558777dccef85c2a2d07ff64a6d1f2407c3931bbf 행 SHA-256 3e27d486a2659b970651acfdf49db2543eeca939d8fbdb738b7dfe2ce12695dd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-12 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232674|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c086b44fb99deea8
Sources EV-66124bdc5fa2507f1704d4e8 Evidence SHA-256 b93844b071d3baa22be58d4558777dccef85c2a2d07ff64a6d1f2407c3931bbf 행 SHA-256 3e27d486a2659b970651acfdf49db2543eeca939d8fbdb738b7dfe2ce12695dd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-02 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232674|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c086b44fb99deea8
Sources EV-66124bdc5fa2507f1704d4e8 Evidence SHA-256 b93844b071d3baa22be58d4558777dccef85c2a2d07ff64a6d1f2407c3931bbf 행 SHA-256 3e27d486a2659b970651acfdf49db2543eeca939d8fbdb738b7dfe2ce12695dd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-05 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232674|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c086b44fb99deea8
Sources EV-66124bdc5fa2507f1704d4e8 Evidence SHA-256 b93844b071d3baa22be58d4558777dccef85c2a2d07ff64a6d1f2407c3931bbf 행 SHA-256 3e27d486a2659b970651acfdf49db2543eeca939d8fbdb738b7dfe2ce12695dd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2023-10 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232674|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c086b44fb99deea8
Sources EV-66124bdc5fa2507f1704d4e8 Evidence SHA-256 b93844b071d3baa22be58d4558777dccef85c2a2d07ff64a6d1f2407c3931bbf 행 SHA-256 3e27d486a2659b970651acfdf49db2543eeca939d8fbdb738b7dfe2ce12695dd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232674|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c086b44fb99deea8
Sources EV-66124bdc5fa2507f1704d4e8 Evidence SHA-256 b93844b071d3baa22be58d4558777dccef85c2a2d07ff64a6d1f2407c3931bbf 행 SHA-256 3e27d486a2659b970651acfdf49db2543eeca939d8fbdb738b7dfe2ce12695dd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-09 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232674|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c086b44fb99deea8
Sources EV-66124bdc5fa2507f1704d4e8 Evidence SHA-256 b93844b071d3baa22be58d4558777dccef85c2a2d07ff64a6d1f2407c3931bbf 행 SHA-256 3e27d486a2659b970651acfdf49db2543eeca939d8fbdb738b7dfe2ce12695dd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232674|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c086b44fb99deea8
Sources EV-66124bdc5fa2507f1704d4e8 Evidence SHA-256 b93844b071d3baa22be58d4558777dccef85c2a2d07ff64a6d1f2407c3931bbf 행 SHA-256 3e27d486a2659b970651acfdf49db2543eeca939d8fbdb738b7dfe2ce12695dd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2024-03 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232674|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c086b44fb99deea8
Sources EV-66124bdc5fa2507f1704d4e8 Evidence SHA-256 b93844b071d3baa22be58d4558777dccef85c2a2d07ff64a6d1f2407c3931bbf 행 SHA-256 3e27d486a2659b970651acfdf49db2543eeca939d8fbdb738b7dfe2ce12695dd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type route_or_site_confirmation date 2024-10 date_precision month assertion source_stated_candidate verification_status source_text_candidate operational_proof false source_key 202609|232674|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c086b44fb99deea8
Sources EV-66124bdc5fa2507f1704d4e8 Evidence SHA-256 b93844b071d3baa22be58d4558777dccef85c2a2d07ff64a6d1f2407c3931bbf 행 SHA-256 3e27d486a2659b970651acfdf49db2543eeca939d8fbdb738b7dfe2ce12695dd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-11 date_precision month assertion source_mentioned_unverified verification_status source_text_candidate operational_proof false source_key 202609|232674|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c086b44fb99deea8
Sources EV-66124bdc5fa2507f1704d4e8 Evidence SHA-256 b93844b071d3baa22be58d4558777dccef85c2a2d07ff64a6d1f2407c3931bbf 행 SHA-256 3e27d486a2659b970651acfdf49db2543eeca939d8fbdb738b7dfe2ce12695dd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_c086b44fb99deea8 stable_project_id kproj_20573fbc956bd4b8 source_key 202609|232674|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 154kV 금가분기 송전선로 건설사업 project_name_detail 154kV 금가분기T/L 건설사업 region_summary_raw 충청북도 충주시등 1 지역 equipment_type_raw 가공송전 headquarters_raw 중부건설본부 office_raw 충북강원건설지사 section_fields Project purpose 충주 금가산단 등 지역개발에 따른 신규공급능력 확보 Project region Chungju City, North Chungcheong Province 사업 규모 ACSR410 × 2B × 4C, 6.3KM (철탑14기) 입지선정 전력입지영향평가 용역 착수: 2023.10 입지선정위원회 구성시기: 2024.02 참여 위원 수 : 18 지장유무 조회: 2024.07~2024.08 경과지(부지) 확정: 2024.10 환경/재해 영향평가 환경영향평가: 2025.11 ~ 재해영향평가: 2025.11 ~ 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: 입지선정 및 주민의견 수렴 주요 내용 □ '23.05 : 사업계획 확정(제10차 장기송변전계획) □ '23.10 : 경과지 선정 및 설계측량 용역 착수 □ '23.11 : 지자체 대상 사업설명회 □ '24.01 : 입지선정위원회 구성 완료 □ '24.02 : 입지선정위원회 1차 회의 □ '24.03 : 입지선정위원회 2차 회의 □ '24.06 : 입지선정위원회 3차 회의 □ '24.07 : 최적 경과대역 결정에 따른 사업설명회 □ '24.09 : 입지선정위원회 4차 회의 □ '24.10 ~ : 최적 경과지 결정에 따른 사업설명회 □ '24.12 : 입지선정위원회 5차 회의 □ '25.02 : 최적경과지 설계 측량 □ '25.03 ~ : 최적 경과지 관련 마을 대상 설명회 및 의견수렴 □ '25.10 : 자재운반, 재해·환경영향평가 용역 발주 □ '26년 4분기 : 사업시행계획 공고, 열람 및 법적 주민설명회 future_plan_redacted □ 향후계획 □ '26년 4분기 : 사업시행계획 공고, 열람 및 법적 주민설명회 attachment_count 0 source_detail_sha256 b93844b071d3baa22be58d4558777dccef85c2a2d07ff64a6d1f2407c3931bbf first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|232674|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_c086b44fb99deea8
Sources EV-66124bdc5fa2507f1704d4e8 Evidence SHA-256 b93844b071d3baa22be58d4558777dccef85c2a2d07ff64a6d1f2407c3931bbf 행 SHA-256 3e27d486a2659b970651acfdf49db2543eeca939d8fbdb738b7dfe2ce12695dd Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_20573fbc956bd4b8 stable_project_key prjtDef:232674:ESB project_definition 232674 first_region_code ESB manual_source_format false project_name 154kV 금가분기T/L 건설사업 project_name_list 154kV 금가분기 송전선로 건설사업 purpose 충주 금가산단 등 지역개발에 따른 신규공급능력 확보 project_region_detail Chungju City, North Chungcheong Province project_period_raw 2023.06~2027.10 project_scale_raw ACSR410 × 2B × 4C, 6.3KM (철탑14기) responsible_office_raw 중부건설본부/충북강원건설지사 equipment_type 가공송전 headquarters 중부건설본부 office 충북강원건설지사 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_20573fbc956bd4b8
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_20573fbc956bd4b8
Sources EV-523485eb06467816e56bcfaf Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 f8f6fdb71bf66088f03f8a798c48a5a8a994661e6c632e1445e476fe361f4601 Observations for this power asset History for this project