POWER & FACILITY EVIDENCE
Power and Facility Evidence Database Review power assets, contract observations, facility specifications and relationships from public sources.
Global Facilities and Power Map Korea Site and Power Map Korea Data Center Database This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 6items · current page 1–6 · Source records, not unique facilities.
Metric or condition Source value Basis, scope and stage project_name_voltage_label 154 kV literal project name label not service voltage · project name · Construction project As-of date 2026-09 Sources EV-e1ec75422c9776b29a410eca
Detailed source fields Original source field Published value or condition stable_project_id kproj_1c96edba9e7da000 stable_project_key prjtDef:234836:ESB project_definition 234836 first_region_code ESB manual_source_format false project_name 154kV 논산#2분기 전력구 건설사업 project_name_list 논산지역 전기공급시설 전력구공사(논산#2분기) purpose 논산지역 신재생E 접속용량 확보 project_region_detail 충청남도 논산시 project_period_raw 2028.03~2032.10 project_scale_raw 154KV XLPE 2,000(D)X2C, L=2.0KM responsible_office_raw 중부건설본부/직할 equipment_type 전력구 headquarters 중부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_1c96edba9e7da000
Location: Coordinates not obtained · no map marker
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_1c96edba9e7da000
Sources EV-e1ec75422c9776b29a410eca Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 707de832287389823052f7de82560635f00ddf17f19cb733c6d2360e4d535184 Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_start date 2028-03 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234836|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b436f96c42c44c2d
Sources EV-0add7d758c4178cc34bbc567 Evidence SHA-256 f7b690d710f38406d61cc98577d37fd6fea20d81f41c01d91580f7d70a010ec2 행 SHA-256 6afbf97e78c8d0495dff8d5d5d78b96f72fb2e4bb40203e58c8dbc4afcc813eb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type source_mentioned_date date 2025-05-27 date_precision day assertion planned verification_status source_text_candidate operational_proof false source_key 202609|234836|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b436f96c42c44c2d
Sources EV-0add7d758c4178cc34bbc567 Evidence SHA-256 f7b690d710f38406d61cc98577d37fd6fea20d81f41c01d91580f7d70a010ec2 행 SHA-256 6afbf97e78c8d0495dff8d5d5d78b96f72fb2e4bb40203e58c8dbc4afcc813eb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition event_type project_period_end date 2032-10 date_precision month assertion source_project_period verification_status source_field operational_proof false source_key 202609|234836|ESB migration_status reused_from_validated_revision1_schedule
No separate metric summary is available. Consult the detailed source fields.
Source-text schedule candidate. Automatic date/event associations remain unverified and do not establish completion or energization.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b436f96c42c44c2d
Sources EV-0add7d758c4178cc34bbc567 Evidence SHA-256 f7b690d710f38406d61cc98577d37fd6fea20d81f41c01d91580f7d70a010ec2 행 SHA-256 6afbf97e78c8d0495dff8d5d5d78b96f72fb2e4bb40203e58c8dbc4afcc813eb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition snapshot_id ksnap_b436f96c42c44c2d stable_project_id kproj_1c96edba9e7da000 source_key 202609|234836|ESB basic_ym 202609 source_stage_raw 계획확정-사업승인전 project_name_list 논산지역 전기공급시설 전력구공사(논산#2분기) project_name_detail 154kV 논산#2분기 전력구 건설사업 region_summary_raw 충청남도 논산시등 1 지역 equipment_type_raw 전력구 headquarters_raw 중부건설본부 office_raw 직할 section_fields 사업 규모 154KV XLPE 2,000(D)X2C, L=2.0KM 입지선정 전력입지영향평가 용역 착수: 입지선정위원회 구성시기: 참여 위원 수 : 경과지(부지) 확정: 주민의견 수렴 지자체 공고 열람: 설명회·공청회: 자체설명회: - '25.05.27. 제11차 장기 송변전설비계획 수립 future_plan_redacted □ 향후계획 - '25.05.27. 제11차 장기 송변전설비계획 수립 attachment_count 0 source_detail_sha256 f7b690d710f38406d61cc98577d37fd6fea20d81f41c01d91580f7d70a010ec2 first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z Original reference period 202609 source_record_id 202609|234836|ESB
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location snapshot_id:ksnap_b436f96c42c44c2d
Sources EV-0add7d758c4178cc34bbc567 Evidence SHA-256 f7b690d710f38406d61cc98577d37fd6fea20d81f41c01d91580f7d70a010ec2 행 SHA-256 6afbf97e78c8d0495dff8d5d5d78b96f72fb2e4bb40203e58c8dbc4afcc813eb Observations for this power asset History for this project Metric or condition Source value Basis, scope and stage
Detailed source fields Original source field Published value or condition stable_project_id kproj_1c96edba9e7da000 stable_project_key prjtDef:234836:ESB project_definition 234836 first_region_code ESB manual_source_format false project_name 154kV 논산#2분기 전력구 건설사업 project_name_list 논산지역 전기공급시설 전력구공사(논산#2분기) purpose 논산지역 신재생E 접속용량 확보 project_region_detail 충청남도 논산시 project_period_raw 2028.03~2032.10 project_scale_raw 154KV XLPE 2,000(D)X2C, L=2.0KM responsible_office_raw 중부건설본부/직할 equipment_type 전력구 headquarters 중부건설본부 office 직할 current_stage_raw 계획확정-사업승인전 snapshot_count 1 active_snapshot_count 1 snapshot_ids first_seen_at 2026-10-02 last_confirmed_at 2026-10-02T01:55:13Z location_precision region_only geometry_semantics no_verified_geometry geometry Not obtained source_list_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusList.do source_detail_url https://www.kepco.co.kr/home/disclosure/transdisclosure/transstatus/transStatusView.do Original text 계획확정-사업승인전 source_record_id stable_project_id:kproj_1c96edba9e7da000
No separate metric summary is available. Consult the detailed source fields.
Sources, reference dates and retrieval dates 1items kepco_planned ↗ Data Source 2026-09 · Retrieved 2026-10-02
한국전력공사 송변전 건설사업 공개자료, 기존 2026-10-02 수집분
Source location stable_project_id:kproj_1c96edba9e7da000
Sources EV-e1ec75422c9776b29a410eca Evidence SHA-256 3167e203aa54695eefd19a20bffa2a409c9daab229d61c7a194161481ab40dba 행 SHA-256 707de832287389823052f7de82560635f00ddf17f19cb733c6d2360e4d535184 Observations for this power asset History for this project