Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
AES Petersburg
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
345 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-819fd431ef11d23ac2aa944a
Detailed source fields
Original source field
Published value or condition
Utility ID
9273
Utility Name
AES Indiana
Plant Code
994
Plant Name
AES Petersburg
Street Address
State Road 57
City
Petersburg
State
IN
Zip
47567
County
Pike
Latitude
38.5281
Longitude
-87.2525
NERC Region
RFC
Balancing Authority Code
MISO
Balancing Authority Name
Midcontinent Independent Transmission System Operator, Inc..
Name of Water Source
White River
Primary Purpose (NAICS Code)
22
Regulatory Status
RE
Sector
1
Sector Name
Electric Utility
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
Y
Ash Impoundment Lined?
N
Ash Impoundment Status
OS
Transmission or Distribution System Owner
Indianapolis Power & Light Co
Transmission or Distribution System Owner ID
9273
Transmission or Distribution System Owner State
IN
Grid Voltage (kV)
345
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:595
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.