Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Buford
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
115 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-1d43738fd5a79ed19f3cd6c6
Detailed source fields
Original source field
Published value or condition
Utility ID
27813
Utility Name
USCE-Mobile District
Plant Code
759
Plant Name
Buford
Street Address
7000 Powerhouse Road
City
Buford
State
GA
Zip
30518
County
Forsyth
Latitude
34.162279
Longitude
-84.077367
NERC Region
SERC
Balancing Authority Code
SOCO
Balancing Authority Name
Southern Company Services, Inc. - Trans
Name of Water Source
Chattahoochee River
Primary Purpose (NAICS Code)
22
Regulatory Status
RE
Sector
1
Sector Name
Electric Utility
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Georgia Power Co
Transmission or Distribution System Owner ID
7140
Transmission or Distribution System Owner State
GA
Grid Voltage (kV)
115
Energy Storage
N
Natural Gas Storage
N
Liquefied Natural Gas Storage
X
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:481
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.