Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Harry Allen
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
525 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-ada0b56e0eec2b111d169764
Detailed source fields
Original source field
Published value or condition
Utility ID
13407
Utility Name
Nevada Power Co
Plant Code
7082
Plant Name
Harry Allen
Street Address
14601 North Las Vegas Blvd
City
Las Vegas
State
NV
Zip
89124
County
Clark
Latitude
36.430554
Longitude
-114.902405
NERC Region
WECC
Balancing Authority Code
NEVP
Balancing Authority Name
Nevada Power Company
Name of Water Source
Wells
Primary Purpose (NAICS Code)
22
Regulatory Status
RE
Sector
1
Sector Name
Electric Utility
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment Lined?
X
Transmission or Distribution System Owner
Nevada Power Co
Transmission or Distribution System Owner ID
13407
Transmission or Distribution System Owner State
NV
Grid Voltage (kV)
525
Energy Storage
N
Natural Gas Pipeline Name 1
KERN RIVER GAS TRANSMISSION CO
Natural Gas Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:2302
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.