Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
Adams Creek Solar Project
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
345 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-03b4e2d2e76f734fcf15bb53
Detailed source fields
Original source field
Published value or condition
Utility ID
67971
Utility Name
Adams Creek Solar Project, LLC
Plant Code
70300
Plant Name
Adams Creek Solar Project
Street Address
8058 CR129
City
Harrould
State
TX
Zip
76364
County
Wilbarger
Latitude
34.15382
Longitude
-98.963332
NERC Region
TRE
Balancing Authority Code
ERCO
Balancing Authority Name
Electric Reliability Council of Texas, Inc.
Name of Water Source
NA
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
N
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Transmission or Distribution System Owner
Oncor Electric Delivery Company LLC
Transmission or Distribution System Owner ID
44372
Transmission or Distribution System Owner State
TX
Grid Voltage (kV)
345
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:17201
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.