Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
USS St Anne Solar LLC (St. Anne 1)
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
35 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-b30cbdeb4e0b28ae4ad57c5f
Detailed source fields
Original source field
Published value or condition
Utility ID
67955
Utility Name
SRC Partnership 16, LLC
Plant Code
70268
Plant Name
USS St Anne Solar LLC (St. Anne 1)
Street Address
E 5000S Rd
City
St Anne
State
IL
Zip
60964
County
Kankakee
Latitude
41.05358
Longitude
-87.69565
NERC Region
RFC
Balancing Authority Code
PJM
Balancing Authority Name
PJM Interconnection, LLC
Name of Water Source
NA
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
24-956-000
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Transmission or Distribution System Owner
Commonwealth Edison Co
Transmission or Distribution System Owner ID
4110
Transmission or Distribution System Owner State
IL
Grid Voltage (kV)
35
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:17169
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.