Review power assets, contract observations, facility specifications and relationships from public sources.
This partial collection preserves source-level observations. Generation and registered connection capacity are distinct from spare supply capacity for data centers. Planned dates and contract announcements do not confirm energization or supply commencement.
Current filters 2items · current page 1–2 · Source records, not unique facilities.
Power assets and projects · USA · eia860
FL Solar D1, LLC
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
25 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-82a9e6ac00c36cf1f23d4d98
Detailed source fields
Original source field
Published value or condition
Utility ID
60281
Utility Name
Altus Power America Management, LLC
Plant Code
70179
Plant Name
FL Solar D1, LLC
Street Address
945 Potter Woodbery Rd
City
Havana
State
FL
Zip
32333
County
Gadsden
Latitude
30.654933
Longitude
-84.428356
NERC Region
SERC
Balancing Authority Code
FMPP
Balancing Authority Name
Florida Municipal Power Pool
Name of Water Source
NA
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
22-995-002
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Transmission or Distribution System Owner
Talquin Electric Coop, Inc
Transmission or Distribution System Owner ID
18449
Transmission or Distribution System Owner State
FL
Grid Voltage (kV)
25
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:17081
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05
Source: U.S. Energy Information Administration (EIA), 2025 final / August 2026 preliminary.