Galesburg 650 Solar 1, LLC
Generation facilities · Unverified
Metric or condition
Source value
Basis, scope and stage
Grid Voltage (kV)
15 kV
Original source column definition · Power plant · Unverified As-of date 2025 Sources EV-3bed3a5d5b0c855dff06e1e4
Detailed source fields
Original source field
Published value or condition
Utility ID
67852
Utility Name
SREOG IL Partnership 3, LLC
Plant Code
70073
Plant Name
Galesburg 650 Solar 1, LLC
Street Address
1510 Knox Rd 650 E
City
Galesburg City
State
IL
Zip
61401
County
Knox
Latitude
40.928617
Longitude
-90.319573
NERC Region
SERC
Balancing Authority Code
PJM
Balancing Authority Name
PJM Interconnection, LLC
Name of Water Source
NA
Primary Purpose (NAICS Code)
22
Regulatory Status
NR
Sector
2
Sector Name
IPP Non-CHP
FERC Cogeneration Status
N
FERC Small Power Producer Status
Y
FERC Small Power Producer Docket Number
23-1054-000
FERC Exempt Wholesale Generator Status
N
Ash Impoundment?
N
Transmission or Distribution System Owner
Ameren Illinois Company
Transmission or Distribution System Owner ID
56697
Transmission or Distribution System Owner State
IL
Grid Voltage (kV)
15
Energy Storage
N
Coordinate accuracy
source_precision_not_independently_surveyed
source_record_id
2___Plant_Y2025.xlsx#Plant:16975
Coordinates locate the plant, including when this record describes one generator.
Location: Plant location · not an individual generator location
Sources, reference dates and retrieval dates 1itemseia860 ↗
Data Source 2025 · Retrieved 2026-10-05